Teledyne CombiFlash NextGen Installation And Operation Manual page 96

Table of Contents

Advertisement

CombiFlash NextGen Systems
Section 5 Maintenance
Figure 5-7 Detection Options screens
5-8
4. Exit the Edit Method screen and accept the changes, then
allow approximately 5 minutes for the chamber to reach
the set temperature.
5. Lift the P-trap drain tubing up to approximately case top
level. Using a wash bottle, syringe, or suitable measuring
device, slowly fill the drain line with up to 40 mL of ace-
tone. Lift the end of the tubing as needed to transfer most
of the liquid into the spray chamber. Make sure the fluid
level in the tubing doesn't exceed the level of the instru-
ment case top. If the tubing is raised too fast, fluid may
flow out the top of the vent tube causing a spill. Hold the
tubing up for at least 1 minute after the fluid has been
transferred to the spray chamber.
EAR99 Technology Technology Subject to Restrictions Contained on the Cover Page

Advertisement

Table of Contents
loading

This manual is also suitable for:

Combiflash nextgen 100Combiflash nextgen 300

Table of Contents