Chapter 5 Procedures Before Operation - Mitsubishi Electric NZ2GF2B1-16D User Manual

Cc-link ie field network remote i/o module
Table of Contents

Advertisement

CHAPTER 5
This chapter describes the procedures before operation.
Check box
Station number setting
Set the station number for an I/O module.
When using an extension module, connect the extension module to the
main module.
After that, mount the I/O module to a DIN rail.
Connect the I/O module to a power supply, Ethernet cables, and external
devices.
Parameter setting and programming
Set the parameters and create a program.
*1
To replace the module, refer to the point below.
To replace the module, follow the procedure described below:
• Turn off the module power supply and remove the I/O module.
• Prepare a new I/O module and perform the procedure above from "Station number setting" to "Parameter setting
and programming". (The network parameter of the master station does not need to be set again.)
• After checking the operation, restart the control.
PROCEDURES BEFORE OPERATION
Installation
Wiring

CHAPTER 5 PROCEDURES BEFORE OPERATION

Page 138, Section 7.1
Page 139, Section 7.2
Page 141, Section 7.3
Page 146, Section 7.4
Page 153, Section 7.6
Page 156, Section 7.7
Page 160, Section 8.1
Page 168, Section 8.2
Page 233, CHAPTER 11
5
*1
133

Advertisement

Table of Contents
loading

Table of Contents