Loading The Project Data Into The Converter - Siemens SINAMICS S120 Commissioning Manual

With startdrive
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Commissioning

5.8 Loading the project data into the converter

5.8
Loading the project data into the converter
Overview
In order to set up your project, you need to load the project data you generated offline on the
connected drive units. Project data are generated, for example:
• When configuring the hardware
• When configuring networks and connections
Requirements
• The project data is consistent.
• Each drive unit to be loaded can be accessed online.
Procedure
To download the project data into your drive unit, proceed as follows:
1. Select one or more drive units in the project tree.
2. Call the shortcut menu "Load into device".
OR
3. Click on the icon
– Online connection exists
– Online connection does not exist
242
"Load to device" in the toolbar.
If an online connection exists between a project and a drive device, the "Load preview"
dialog opens. Messages are displayed and necessary actions are suggested in this dialog.
If there is no established online connection, the "Extended loading" dialog opens and you
must first select the interfaces with which the online connection to the device should be
established. You have the option of showing all compatible devices by selecting the
corresponding option and clicking the "Start search" command.
Commissioning with Startdrive
Commissioning Manual, 06/2020, 6SL3097-5AA10-0BP2

Advertisement

Table of Contents
loading

Table of Contents