Inserting The Control Unit; Inserting A Control Unit Via The Project View (Recommended) - Siemens SINAMICS S120 Commissioning Manual

With startdrive
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

5.3.4

Inserting the Control Unit

A Control Unit must be inserted as the first component of a drive. You insert a SINAMICS S120
Control Unit into a new project via one of the following described ways:
• Via the project view (recommended)
• Via the portal view
• Via the network/topology view
• From existing projects
• From existing libraries
5.3.4.1

Inserting a Control Unit via the project view (recommended)

Overview
The following describes how to insert a SINAMICS S120 Control Unit into a new project via the
project view.
Requirements
• A project has been created, or an existing project is open.
• The online connection to the drive is deactivated.
Commissioning with Startdrive
Commissioning Manual, 06/2020, 6SL3097-5AA10-0BP2
Commissioning
5.3 Creating a project offline
103