Commissioning
5.6 Alternative 2: Creating a project with a determined drive configuration
Result
The Control Unit is inserted and can then be configured.
Example: CU310-2 PN inserted
5.6.3
Determining the drive configuration
Overview
The individual steps for automatically determining the drive configuration via the function
"Detection of the device configuration" are described below.
Requirements
• A project has been created.
• A Control Unit has been inserted into the device configuration.
• An online connection has been established to the drive.
174
Example: CU320-2 PN inserted
Commissioning Manual, 06/2020, 6SL3097-5AA10-0BP2
Commissioning with Startdrive