FINAL DRIVE/JET PUMP/BILGE SYSTEM
Pump Installation
8.
Install steering nozzle. Apply Loctite 242 (Blue) and
torque to specifications.
NoiSJe Boll|fmmlb)
9.
Install reverse mechanism, if applicable.
Apply
Loctite 242 (Blue) and torque to specifications.
Inspect
reverse
cable
adjustment.
See
Maintenance section. (Reverse gates may differ.)
Reverse Gate Actuator Pivot Bolt TQrque
Reverse Gate Pivot Bolt Torque
10. Thoroughly grease bearing housing and coupler.
3/00
5.20
Polaris Sales Inc.