Polaris Virage TX 2000 Service Manual page 185

Service manual
Table of Contents

Advertisement

FINAL DRIVE/JET PUMP/BILGE SYSTEM
Pump Installation
5.
Apply a light film of grease to a new O-ring on the
cooling water supply pipe.
6.
Align interlocking tabs (D) and install stator housing
to pump housing. Apply Loctite 242 (Blue) to the
four
5/16"
mounting
bolts
and
torque
to
specification.
NOTE: Install wedge between stationary housing and
stator housing (where applicable). Thick edge is posi
tioned toward bottom, and corner tabs must align.
Stator Section Mounting Bolt Torque
Apply Loctite™ 242 (Blue)
18 ft. lbs. (24.9 Nm)
7.
Install bilge siphon lines and secure with new
cable ties. Tighten securely.
Polaris Sales Inc.
5.19
3/00

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents