Connecting To The Nitrogen Supply - Waters Xevo TQ-S Operator's, Overview And Maintenance Manual

Mass spectrometry system
Table of Contents

Advertisement

Connecting to the nitrogen supply

Required materials
Chemical-resistant, powder-free gloves
6-mm PTFE tubing (included in the Waters Installation Kit)
Nitrogen regulator
To connect the nitrogen supply:
1.
Connect one end of the 6-mm PTFE tubing to the nitrogen inlet port on
the rear of the instrument.
Nitrogen and collision cell gas inlet and vacuum connectors:
Collision cell gas inlet
Source vacuum
Turbo vacuum
2.
Attach a nitrogen regulator (not provided) to the nitrogen supply.
3.
Connect the free end of the 6-mm PTFE tubing to the nitrogen regulator.
Requirement:
least 95%.
4.
Set the nitrogen regulator to 600 to 690 kPa (6.5 to 7.0 bar, 94 to
102 psi).
Pilot valve port
The nitrogen must be dry and oil-free, with a purity of at
February 28, 2014, 715002212 Rev. C

Connecting to the nitrogen supply

Nitrogen exhaust
Nitrogen inlet port
255

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents