Waters Xevo TQ-S Operator's, Overview And Maintenance Manual page 140

Mass spectrometry system
Table of Contents

Advertisement

4 Maintenance Procedures
Rationale:
assembly.
4.
Close the source isolation valve (see
5.
Use the combined 2.5-mm Allen wrench and cone extraction tool to
unscrew the 4, captive, ion block assembly securing screws.
6.
Remove the ion block assembly from the PEEK ion block support.
140
February 28, 2014, 715002212 Rev. C
Removing the source enclosure aids access to the ion block
TP03130
TP03130
page
107).
Ion block assembly
securing screws
PEEK ion block support
Ion block assembly

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents