Group 2 Main Control Valve - Hyundai HX130LCR Manual

Hide thumbs Also See for HX130LCR:
Table of Contents

Advertisement

GROUP 2 MAIN CONTROL VALVE

1. STRUCTURE
MRV
Pu
A1
B1
P02
Pb21
Dr1
ORV
A2
B2
B2
ORV
Dr2
A2
B4
ORV
ORV
A5
B5
A5
B5
P04
NRV2
Rs
NRV1
VIEW A
Dr0
TRAVEL LEFT
TRAVEL RIGHT
Pb1
Pc1
BOOM 1
Pb20
Pc2
ARM 2
BOOM 2 &
Pb3
Pc3
A
SWING PRIORITY
Pc42
Pb4
ARM REGENERATION
Pc40
ARM 1
& OPTION-A(BREAKER)
BUCKET
Po4
Pc5
Pc6
DOZER DOWN
T1
P2
P3
P1
Dr4
Dr5
PO
C1
D1
SWING
C2
D2
P03
ORV
ORV
V3
- D4
- C4
D4
C4
Dr3
ORV
OPTION-B
ORV
C5
D5
- C5
- D5
P05
C6
D6
Pn1
Pn2
2-20
Ai
STRAIGHT TRAVEL
Pd0
TRAVEL RIGHT
Pd1
Pa1
Patt
SWING
Pd2
Pa20
BOOM 2 &
Pd41
SWING PRIORITY
Pa21
ARM 1
Pa4
Pc41
Pd40
OPTION-B
Pd5
Pa5
DOZER UP
Pd6
2-20
Mark
Port name
Rs
Make up for swing motor
Pa1
Travel left pilot port (BW)
Pb1
Travel left pilot port (FW)
Pc1
Travel right pilot port (FW)
Pd1
Travel right pilot port (BW)
Pa20
Boom up pilot port
Pa21
Boom up confluence pilot port
Pb20
Boom down pilot port
Pb21
Lock valve pilot port (boom)
Pc2
Swing pilot port (RH)
Pd2
Swing pilot port (LH)
Pb3
Arm in confluence pilot port
Pc3
Swing priority pilot port
Pa4
Option A pilot port (breaker)
Pb4
Arm in regeneration cut port
Pc40
Arm in pilot port
Pc41
Lock valve pilot port (arm)
Pc42
Arm in regen-cut signal selector port
Pd40
Arm out pilot port
Pd41
Arm out confluence pilot port
Pa5
Bucket in pilot port
Pb5
Bucket out pilot port
Pc5
Option B pilot port
Pd5
Option B pilot port
Pc6
Option C pilot port (dozer blade down)
Pd0
Travel straight pilot port
Pd6
Option C pilot port (dozer blade up)
P0
Pilot pressure port
Pu
Main relief pressure up pilot port
TRAVEL LEFT
Ai
Auto idle signal port
Patt
Auto idle signal-attachment
BOOM 1
P02
Pilot signal port
P03
Boom priority pilot port
P04
Boom stroke limit port
ARM 2
P05
Breaker summation pilot port
Puo
Pilot pressure port (not used)
ARM REGENERATION
& OPTION-A(BREAKER)
Dr0
Drain port (travel straight)
Dr1
Drain port (boom holding valve)
BUCKET
Dr2
Drain port (boom 2 & swing priority)
Dr3
Drain port (arm holding valve)
P3
Quick clamp port
Pn1
Negative control signal port (P1 port side)
Pn2
Negative control signal port (P2 port side)
A1
Travel motor left side port (BW)
B1
Travel motor left side port (FW)
C1
Travel motor right side port (FW)
D1
Travel motor right side port (BW)
B2
Boom rod side port
C2
Swing motor port (RH)
D2
Swing motor port (LH)
B4
Option A port (breaker)
A5
Bucket head side port
B5
Bucket rod side port
C5
Option B port
D5
Option B port
C6
Option C pilot port (dozer down port)
D6
Option C pilot port (dozer up port)
P1
Pump port (P1 side)
P2
Pump port (P2 side)
A2
Boom head side port
C4
Arm head side port
D4
Arm rod side port
Dr4
Drain port (swing logic valve)
Dr5
Drain port (flow summation)
130ZF2MC01
T1
Return port
Port size
Tightening torque
UNF 1 3/16
18 kgf·m (130 lbf·ft)
3.5~3.9 kgf·m
PF 1/4
(25.3~28.2 lbf·ft)
7~8 kgf·m
PF 3/8
(50.6~57.8 lbf·ft)
15~18 kgf·m
PF 3/4
(109~130 lbf·ft)
20~25 kgf·m
PF 1
(115~180 lbf·ft)
1.5~1.9 kgf·m
PF 1/8
(10.8~13.7 lbf·ft)
SAE3000, 1 1/2
8.5~11.5 kgf·m
(M12×1.75)
(61.5~83.1 lbf·ft)

Advertisement

Table of Contents
loading

Table of Contents