TEST PROCEDURE
2)
(1)
Test 18: Check voltage between connector
CN-88 (2) - GND.
Disconnect connector CN-88 from power
①
max solenoid valve.
Start switch ON.
②
Check voltage as figure.
③
(2)
Test 19: Check resistance of the solenoid
valve between CN-88 (1)-(2).
Starting switch OFF.
①
Disconnect connector CN-88 from power
②
max solenoid valve.
Check resistance as figure.
③
SPEC : Starting switch ON : 24±1V
Starting switch OFF : 0V
Power max switch
Power max
solenoid valve
1
2
SPEC : 15~35Ω
Power max switch
Power max
solenoid valve
1
6-66
6-66
LH RCV lever
CN-88
2
1
GROUND
Multimeter
130ZF6MS14
LH RCV lever
CN-88
2
2
Multimeter
130ZF6MS15
1