(15)
Assemble spring pin (15).(3 pcs)
(16)
Caulking is performed on the assembled
spring pin unit.
To cover pins, implement the caulking in two
※
places that are located direction of 180
degrees around assembled spring pin.
Drive shaft sub assy assembly
(17)
After heating sleeve (25), assemble O-ring
(26) to groove of inside diameter in it.
(18)
Shrink fit the sleeve on drive shaft (2).
Be careful of fully seat at the bottom.
※
Caulking
(two places)
8-73
125LCR8SM98
Pin
1.0~2.0
125LCR8SM99
125LCR8SM100
125LCR8SM101