Group 2 Main Control Valve - Hyundai HX145LCR Manual

Hide thumbs Also See for HX145LCR:
Table of Contents

Advertisement

GROUP 2 MAIN CONTROL VALVE

GROUP 2 MAIN CONTROL VALVE

1. STRUCTURE
1. STRUCTURE
MRV
Pu
A1
B1
P02
Pb21
Dr1
ORV
A2
B2
B2
ORV
Dr2
A2
B4
ORV
ORV
A5
B5
A5
B5
P04
Rs
NRV2
NRV1
VIEW A
Dr0
TRAVEL LEFT
TRAVEL RIGHT
Pb1
Pc1
BOOM 1
Pb20
Pc2
ARM 2
BOOM 2 &
Pb3
Pc3
SWING PRIORITY
A
Pc42
Pb4
ARM REGENERATION
Pc40
ARM 1
& OPTION-A(BREAKER)
BUCKET
P04
Pc5
Pc6
OPTION-C
T1
P2
P3
P1
Dr4
Dr5
PO
C1
D1
SWING
C2
D2
P03
ORV
ORV
V3
- C4
- D4
C4
D4
Dr3
Pc41
ORV
ORV
OPTION-B
C5
D5
- C5
- D5
P05
C6
D6
Pb5
Pn1
Pn2
Ai
STRAIGHT TRAVEL
Pd0
TRAVEL LEFT
TRAVEL RIGHT
Pd1
Pa1
Patt
BOOM 1
SWING
Pd2
Pa20
BOOM 2 &
ARM 2
Pd41
SWING PRIORITY
Pa21
ARM REGENERATION
ARM 1
Pa4
& OPTION-A(BREAKER)
Pd40
OPTION-B
Pd5
Pa5
BUCKET
OPTION-C
Pd6
145LCR2MC01
2-20
Mark
Port name
Port size
Rs
Make up for swing motor
UNF 1 3/16
Pa1
Travel left pilot port (BW)
Pb1
Travel left pilot port (FW)
Pc1
Travel right pilot port (FW)
Pd1
Travel right pilot port (BW)
Pa20
Boom up pilot port
Pa21
Boom up confluence pilot port
Pb20
Boom down pilot port
Pb21
Lock valve pilot port (boom)
Pc2
Swing pilot port (RH)
Pd2
Swing pilot port (LH)
Pb3
Arm in confluence pilot port
Pc3
Swing priority pilot port
Pa4
Option A pilot port (breaker)
Pb4
Arm in regeneration cut port
Pc40
Arm in pilot port
Pc41
Lock valve pilot port (arm)
Pc42
Arm in regen-cut signal selector port
Pd40
Arm out pilot port
Pd41
Arm out confluence pilot port
PF 1/4
Pa5
Bucket in pilot port
Pb5
Bucket out pilot port
Pc5
Option B pilot port
Pd5
Option B pilot port
Pc6
Option C pilot port (dozer blade down)
Pd6
Option C pilot port (dozer blade up)
P0
Pilot pressure port
Pu
Main relief pressure up pilot port
Ai
Auto idle signal port
Patt
Auto idle signal-attachment
P02
Pilot signal port
P03
Boom priority pilot port
P04
Boom parallel orifice pilot port
P05
Breaker summation pilot port
Puo
Pilot pressure port
Dr0
Drain port (travel straight)
Dr1
Drain port (boom holding valve)
Dr2
Drain port (boom 2 & swing priority)
Dr3
Drain port (arm holding valve)
Pn1
Negative control signal port (P1 port side)
Pn2
Negative control signal port (P2 port side)
PF 3/8
P3
Quick clamp port
A1
Travel motor left side port (BW)
B1
Travel motor left side port (FW)
C1
Travel motor right side port (FW)
D1
Travel motor right side port (BW)
B2
Boom rod side port
C2
Swing motor port (RH)
D2
Swing motor port (LH)
B4
Option A port (breaker)
PF 3/4
A5
Bucket head side port
B5
Bucket rod side port
C5
Option B port
D5
Option B port
C6
Option C pilot port (dozer down port)
D6
Option C pilot port (dozer up port)
P1
Pump port (P1 side)
P2
Pump port (P2 side)
A2
Boom head side port
C4
Arm head side port
PF 1
D4
Arm rod side port
Dr4
Drain port (swing logic valve)
PF 1/8
Dr5
Drain port (flow summation)
SAE3000, 1 1/2
T1
Return port
(M12×1.75)
Tightening torque
18 kgf·m (130 lbf·ft)
3.5~3.9 kgf·m
(25.3~28.2 lbf·ft)
7~8 kgf·m
(50.6~57.8 lbf·ft)
15~18 kgf·m
(109~130 lbf·ft)
20~25 kgf·m
(115~180 lbf·ft)
1.5~1.9 kgf·m
(10.8~13.7 lbf·ft)
8.5~11.5 kgf·m
(61.5~83.1 lbf·ft)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents