(17)
Disassemble needle bearing No.2 (12).
(3 pcs)
(18)
Separate ring gear (1) from casing (8).
(19)
Loosen bolt (7) (4 pcs), and disassemble
lock plate (6).
(20)
Disassemble ring nut (5) by using the jig.
8-67
125LCR8SM76
125LCR8SM77
125LCR8SM78
125LCR8SM79