Group 4 Main Control Valve - Hyundai HX130LCR Manual

Hide thumbs Also See for HX130LCR:
Table of Contents

Advertisement

GROUP 4 MAIN CONTROL VALVE

1. REMOVAL AND INSTALL OF MOTOR
1)
REMOVAL
(1)
Lower the work equipment to the ground
and stop the engine.
(2)
Operate the control levers and pedals
several times to release the remaining
pressure in the hydraulic piping.
(3)
Loosen the breather slowly to release the
pressure inside the hydraulic tank.
Escaping fluid under pressure can
penetrate the skin causing serious injury.
When pipes and hoses are disconnected,
the oil inside the piping will flow out, so
catch it in oil pan.
(4)
Remove the wirings for the pressure
sensor and so on.
(5)
Remove bolts and disconnect pipe.
(6)
Disconnect pilot line hoses.
(7)
Disconnect pilot piping.
(8)
Sling the control valve assembly and
remove the control valve mounting bolt
and bracket.
·Weight : 80 kg (175 lb)
·Mounting bolt
Tightening torque : 12.2±1.3 kgf.m
(9)
Remove the control valve assembly.
When removing the control valve
assembly, check that all the piping have
been disconnected.
2)
INSTALL
(1)
Carry out installation in the reverse order
to removal.
(2)
Bleed the air from below items.
Cylinder (Boom, arm, bucket)
Swing motor
Travel motor
See each item removal and install.
(3)
Confirm the hydraulic oil level and
recheck the hydraulic oil leak or not.
(88.2±9.4 lbf.ft)
8-32
Pd6
Pd5
Pd40
Pd2
Pa5
Pc41
D4
Pa20
C4
Pb5
A5
B5
A2
Pc6
Pc42
Pc5
Pc2
Pb3
Pb20
Pc3
B2
Pa21
Pa1
Pd1
Pd40
Pc41
Pd41
Pa20
D2
D1
C2
Pb21
C1
Pc40
Po4
Pc42
A1
Pc1
Pb20
Pb1
B1
Pa4
Dr3
DR5
Pn2
PO
Pn1
PO3
DR1
DR4
PO2
DR2
Pu
Pb4
DR0
13031GE18
130ZF8MC01
130ZF8MC02
130ZF8MC03

Advertisement

Table of Contents
loading

Table of Contents