3)
BOOM ASSEMBLY
(1)
Removal
Remove arm and bucket assembly.
①
For details, see removal of arm and
bucket assembly.
②
Remove boom cylinder assembly from
boom.
For details, see removal of boom
cylinder assembly.
Disconnect head lamp wiring.
③
Disconnect bucket cylinder hose (2)
④
and arm cylinder hose (1).
When the hose are disconnected, oil
※
may spurt out.
Sling boom assembly (3).
⑤
Remove bolt (4), plate (5) and pull out
⑥
the pin (6) then remove boom assembly.
·Weight (2.26 m) : 345 kg (761 lb)
When lifting the boom assembly always
※
lift the center of gravity.
(2)
Install
①
Carry out installation in the reverse order
to removal.
When lifting the arm assembly, always
lift the center of gravity.
※
Bleed the air from the cylinder.
8-184
130ZF8BM01
A
2
1
VIEW A
130ZF8BM02
Crane
4, 5, 6
3
130ZF8BM03
130ZF8BM04