Camshaft Installation / Timing - Polaris RZR XP 1000 2014 Service Manual

Table of Contents

Advertisement

ENGINE / COOLING SYSTEM
7. Install and finger tighten the two outer M6 bolts
evenly.
Install new cylinder head bolts.
8. Torque
cylinder
head
specification.
TORQUE
Cylinder Head Torque Procedure:
Torque in sequence
Step 1: 9 ft-lbs (12 Nm)
Step 2: 26 ft-lb (35 Nm)
Step 3: Additional 180°
Step 4: M6 bolts: 7 ft-lb (10 Nm)
3.80
NOTE
bolts
in
sequence
y

CAMSHAFT INSTALLATION / TIMING

If any valve train components were replaced, refer to
Valve Clearance Adjustment, page 3.85 procedure prior
to Camshaft Installation / Timing, page 3.80.
to
1. Rotate the engine until the flywheel Top Dead Center
(TDC) mark
Crankshaft Position Sensor (CPS) mounting hole
This places the PTO cylinder at TDC for camshaft
installation.
DO NOT use the "V" mark located on the flywheel
opposite of the "I" mark. Only the "I" mark should be
used as a TDC reference.
2. Reference the intake and exhaust markings made
during disassembly. If installing new camshafts or if
camshafts were not marked, you can reference the
part number stamped on the end of the shafts and
compare to the electronic parts catalog.
3. Lubricate all camshaft lobes and bearing journal
surfaces with Polaris PS-4 engine oil prior to
installation.
9926816 R07 - 2014-2016 RZR XP 1000 / XP4 1000 Service Manual
NOTE
q
is aligned or centered in the
NOTE
© Copyright Polaris Industries Inc.
w
.

Advertisement

Table of Contents
loading

Table of Contents