Camshaft Installation / Timing - Polaris RZR XP Service Manual

2018-2019
Table of Contents

Advertisement

5. Carefully set the cylinder head
alignment pins.
6. Install new bolts and finger tighten the six cylinder
t
head bolts
evenly.
IMPORTANT
Lightly oil the threads and under the flange head on all
the head bolts with new engine oil.
7. Install and finger tighten the two outer M6 bolts
evenly.
NOTE
Install new cylinder head bolts any time the head is
removed.
8. Torque
cylinder
head
specification.
TORQUE
Cylinder Head Bolts:
Torque in sequence
Step 1: 13 ft-lbs (18 Nm)
Step 2: 26 ft-lb (35 Nm)
Step 3: Additional 180°
Step 4: Additional 180°
Step 5: M6 bolts: 7 ft-lb (10 Nm)
9929419 R02 - 2018-2019 RZR XP / XP 4 Turbo S Service Manual
© Copyright Polaris Industries Inc.
r
in place on
y
bolts
in
sequence
to
ENGINE / COOLING SYSTEM

CAMSHAFT INSTALLATION / TIMING

NOTE
If any valve train components were replaced, refer to
Valve Clearance Adjustment page 2.31 procedure prior
to performing this procedure.
1. Rotate the engine until the flywheel Top Dead Center
q
(TDC) mark
is aligned with the top edge of the
Crankshaft Position Sensor (CPS) mounting hole
This places the PTO cylinder at TDC for camshaft
installation.
NOTE
DO NOT use the "V" mark located on the flywheel. Only
the "+" mark should be used as a TDC reference.
2. Reference the intake and exhaust markings made
during disassembly. If installing new camshafts or if
camshafts were not marked, you can reference the
part number stamped on the end of the shafts.
Intake Camshaft - 3023171
Exhaust Camshaft - 3023172
3. Lubricate all camshaft lobes and bearing journal
surfaces with Polaris PS-4 engine oil prior to
installation.
w
.
3
3.99

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr xp4 turbo s

Table of Contents