Balance Shaft Installation; Lower Crankcase Preparation - Polaris RZR XP 1000 2014 Service Manual

Table of Contents

Advertisement

BALANCE SHAFT INSTALLATION

1. Clean the upper crankcase balance shaft bearing
bore surfaces.
2. Align tab of new balance shaft bearings
slot in each bearing bore of crankcase. Press
bearing insert firmly into place.
3. Apply Polaris PS-4 engine oil to both balance shaft
w
journals
.
4. Rotate the crankshaft until the alignment dot
the crankshaft MAG end gear is visible.
9926816 R07 - 2014-2016 RZR XP 1000 / XP4 1000 Service Manual
© Copyright Polaris Industries Inc.
5. Install the balance shaft, placing the tooth with the
alignment dot
gear (see reference images below).
q
with the

LOWER CRANKCASE PREPARATION

Always replace plain bearings when the crankcase or
connecting rods have been disassembled. Refer to
bearing selection procedures.
1. Remove all traces of crankcase sealant from the
crankcase mating surfaces. Inspect the surfaces
closely for nicks, burrs or damage.
2. Clean bolt hole threads to remove any oil or
crankcase sealant.
3. Inspect crankcase bearing bores. Replace the
crankcase assembly if a bearing bore is galled or if
bearing inserts have rotated in the case.
4. Be sure alignment pins are in place where used.
5. Refer to Engine Oil Flow Chart, page 3.5 at the
e
beginning of this chapter and trace the oil paths
on
through the crankcase and cylinder.
6. Flush all oil passages with solvent and then warm
soapy water. Rinse with clear, warm water and dry
with compressed air.
7. Be sure passages are clean and dry before
assembling the crankcase.
ENGINE / COOLING SYSTEM
r
in-line with the dot on the crankshaft
NOTE
3
3.71

Advertisement

Table of Contents
loading

Table of Contents