Piston Ring Removal; Piston Ring To Groove Clearance Inspection - Polaris RZR XP 1000 2014 Service Manual

Table of Contents

Advertisement

ENGINE / COOLING SYSTEM

PISTON RING REMOVAL

1. Carefully remove top compression ring
using a ring removal pliers.
CAUTION
DO NOT expand the ring more than necessary to
remove it from the piston or the ring may break or lose
radial tension.
• Piston ring pliers: Carefully expand ring and lift it off
the piston.
• By hand: Placing both thumbs on the ring ends,
spread the ring open and push up on opposite side. Do
not scratch ring lands.
2. Repeat procedure for second compression ring
3. The oil control ring
consisting of a top and bottom steel rail and a center
expander section. Remove top rail first, then bottom
rail, then the expander.
3.60
q
by hand or
w
e
is a three piece design
PISTON RING TO GROOVE CLEARANCE
INSPECTION
1. Measure piston ring to groove clearance
placing the ring in the ring land and measuring with a
thickness (feeler) gauge. Replace piston and rings if
ring-to-groove clearance exceeds service limits.
Piston Ring to Groove Clearance:
.0007 - .0023" (0.020 - 0.060 mm)
.
9926816 R07 - 2014-2016 RZR XP 1000 / XP4 1000 Service Manual
MEASUREMENT
Top / Second Ring:
Service Limit:
.0047" (0.12 mm)
© Copyright Polaris Industries Inc.
q
by

Advertisement

Table of Contents
loading

Table of Contents