Waters ACQUITY UPLC M-Class System Manual page 59

Hide thumbs Also See for ACQUITY UPLC M-Class:
Table of Contents

Advertisement

Table 4–1: ACQUITY UPLC M-Class system maintenance procedures
Maintenance procedure
Perform leak test
Tightening of fittings
Replace tubing
Table 4–2: Solvent manager maintenance procedures
Maintenance procedure
Replace the pump interconnect tubing
November 26, 2019, 715003588 Revision C
Page 59
Frequency
As needed. For instructions on evaluating the
fluid-handling integrity of the system, see the
online Help regarding the following diagnostic
tests:
• Fluid integrity test
• Dynamic leak test
• Static decay test
• Set-pressure diagnostic test
As needed. For instructions on tightening
fittings, see the component's overview and
maintenance guide on the documentation
CD.
As needed. For instructions on replacing
tubing, see the component's overview and
maintenance guide on the documentation
CD.
Frequency
As part of the annual scheduled routine
maintenance and thereafter, as needed. The
typical failure modes are as follows:
• You see a visible leak.
• The system exhibits a high-pressure
shutdown and the pressure decays when
the connection after the tubing is broken.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents