   Protection
in the correct order. For example, applications first, database servers next, and storage last. It is also possible to turn off some
outlets to reduce power consumption and get longer battery runtime for the most important devices.
For examples on Powering down applications see
down/up applications examples
3.5.4.1 Shutdown on power outage criteria
Shutdown criteria are set per power source (outlet groups) if they are present in the UPS.
By default, shutdown criterias are set to Maximize availability.
3.5.4.1.1 Shutdown criteria selection
The available criteria for shutdown are listed below:
a Maximize availability (default)
To end the shutdown sequence 30s before the end of backup time.
b Immediate OFF
To initiate the shutdown sequence when on battery for 10 seconds.
c Custom
Several conditions can be set to define shutdown criteria:
To initiate the shutdown sequence when on battery for 10 seconds.
Contextual help of the web interface  –  62
the Servicing the Network Management Module>>>Powering
section.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Network-M2 and is the answer not in the manual?

Table of Contents

Save PDF