3.5.4.1.3 When utility comes back
These settings define the restart sequence when utility comes back. For example, this allows sequential startup of the IT system
so that network and storage devices are connected to 'Primary' and start up immediately. After a delay database servers in Group1
are powered up, and then application and web servers in Group 2 are powered up. This startup would ensure that necessary
services would be available for each layer when needed. A sequential startup will also help avoid a peak power draw in the
beginning.
a Options
Keep shutdown sequence running until the end, and then restart (forced reboot).
Wait until UPS battery capacity exceeds a set percentage value in (%), and then automatically restart the UPS.
  Then restart Group 1 after a set time in (s).
  Then restart Group 2 after a set time in (s).
b Enable/Disable
Each option listed above can be enabled or disabled with check-boxes.
When disabled, the option will be greyed out.
3.5.4.2 Access rights per profiles
Protection/Sequence
3.5.4.2.1 For other access rights
For other access rights, see the
Administrator
Information>>>Access rights per
Operator
profiles  section.
Contextual help of the web interface  –  67
Protection
Viewer

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Network-M2 and is the answer not in the manual?

Table of Contents

Save PDF