steps in Plate configuration. If you want to use the Software Suite, refer to Operating the QIAcuity
Software Suite
Note: To modify a plate that was already used, you must remove it from the instrument and load it
again. This ensures that the plate is unlocked and ready for modifications.
Editing the run schedule
Note: Editing the run schedule is only possible on QIAcuity Eight and QIAcuity Four.
When a run starts, it is added to the run schedule and the Edit schedule button is shown on the
screen. If the runs are started individually, they will be added to the schedule in the order which
they were started by tapping the Run
at the same time, using the Run All button, there is a default order in which the plates are run.
In QIAcuity Eight, the run starts with the first slot in the upper tray and ends with the last slot in the
lower tray. The slot numbers are presented in Table 8.
Table 8. Slot numbers the QIAcuity Eight
Tray
Slot numbers
Upper
1
Lower
5
In QIAcuity Four, the run starts with slot number 1, and ends with slot number 4. The slot numbers
are presented in Table 9.
Table 9. Slot numbers of the QIAcuity Four
Slot numbers
1
2
To edit the run schedule, follow these steps:
Note: Only runs that are not started yet (with Pending Run status) can be rearranged.
1. On the Running Status screen, tap Edit run schedule.
QIAcuity User Manual 07/2020
icon on their respective panes. If all the runs are started
2
3
6
7
3
4
8
4
83

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qiacuity 911020Qiacuity 911040Qiacuity 911050

Table of Contents