Implement Tab; Implement Offsets; Section Offsets - Ag Leader EDGE User Manual

Hide thumbs Also See for EDGE:
Table of Contents

Advertisement

Note: Accuracy when measuring for a specific setting is essential to ensure proper machine performance.
I
MPLEMENT
• Add
Press to add a new implement. A wizard will walk you through setting up the implement.
• Keyboard Button
Press to edit the name of a selected implement from the list.
• Wrench Button
Press to edit the Swath Section Offsets. For more information, see
also used to Enable Boom Height Control and access the NORAC UC5 Setup. For more information, see
"NORAC UC5 Setup" on page 151.
• Remove
Press to remove a selected implement.
Note: When deleting an implement all data in the regions and configurations using it will be deleted.
I
O
MPLEMENT
After you complete the initial process of configuring an Implement, you must enter accurate values in the
Section Offsets to ensure proper machine performance. Section Offsets are configured as outlined in the
following steps.

Section Offsets

vehicles.)
110
T
AB
Individual implements are set up and configured from the
Implement Tab. The Implement List displays all previously-
configured implements that are available for use.
FFSETS
1. Press Wrench Button
On the Implement Tab, highlight the Implement Name, press the
Wrench Button, and the Implement Offsets screen appears, as
shown.
2. Enter left or right distance from hitch point
Use the numeric keypad to enter the distance of the midpoint of the
swath section from the machine centerline. Select Left or Right to
indicate the direction the swath section is located from the vehicle
centerline. (This option will not be present on self-propelled
"Implement Offsets" on page 110
. This is

Advertisement

Table of Contents
loading

Table of Contents