Step 3 Switch on the SPD circuit breaker in the PDC to power on the SPD. The SPD indicators
become steady green.
Step 4 Commission monitoring devices in the PDC.
1.
2.
3.
Step 5 (Optional) Commission the PD510 electricity meter.
1.
2.
Step 6 (Optional) Commission the MDU.
1.
2.
Step 7 Switch on the output circuit breakers in the PDC level by level as required to supply power to
downstream equipment.
----End

9.1.1.1 (Optional) Commissioning the 8D ATS

Prerequisites
You have powered on the 8D ATS.
Preparations
Tool: multimeter
Documents: documents delivered with the 8D ATS, 8D ATS initial configuration table, power
supply and distribution system diagram
Skill requirement: power distribution system engineer
Procedure
Step 1 Check whether any alarm is displayed on the 8D ATS controller. If an alarm is displayed,
clear the alarm by following instructions in the delivered documents.
Step 2 Verify 8D ATS configurations by referring to the 8D ATS initial configuration table and
documents delivered with the 8D ATS.
Issue 02 (2017-01-10)
(Optional) If an 8D ATS is configured, go to
ATS
to perform the commissioning.
After the ATS is commissioned, go to
A PDC can be equipped with monitoring components such as an electricity meter or MDU. In certain
scenarios, no monitoring component is installed.
(Optional) If a PD510 electricity meter is configured, go to
(Optional) If an MDU is configured, go to
(Optional) If no monitoring component is configured, go to
For details, see
9.1.1.2 (Optional) Commissioning the PD510 Electricity
After ensuring that the electricity meter works properly, go to
For details, see
9.1.1.3 (Optional) Commissioning the
After ensuring that the MDU works properly, go to
For the diagrams and tables, see the initial configuration parameter manual for the solution in use.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Commissioning Core Components
9.1.1.1 (Optional) Commissioning the 8D
Step
3.
Step
Step
6.
Step
MDU.
Step
7.
5.
7.
Meter.
Step
7.
69

Advertisement

Table of Contents
loading

Table of Contents