FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
5

Items to Be Checked Before Power-On

Preparations
Tools: multimeter, Phillips screwdriver, flat-head screwdriver, step ladder, insulation
megohmmeter, phase sequence meter, pressure gauge
Document required: initial configuration parameter manual
Skill requirement: power distribution system engineer
Items to be Checked Before Power-On
Table 5-1
Issue 02 (2017-01-10)
describes the items to be checked before the FusionModule1000 is powered on.