Preparations For Power-On Commissioning; Tool Preparations - Huawei FusionModule1000B V100R003C00 Commissioning Manual

Water-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Water-Cooled IT Solution
Commissioning Guide

4.1 Tool Preparations

Table 4-1
Table 4-1 Tools
Tools
Phillips screwdriver
Multimeter
Cable tie
Issue 02 (2017-01-10)
4
Preparations for Power-On
lists the tools required for power-on commissioning.
Flat-head screwdriver
Electroprobe
Insulation tape
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

4 Preparations for Power-On Commissioning

Commissioning
Utility knife
Network cable tester
Marker