Huawei FusionModule1000B V100R003C00 Commissioning Manual page 47

Water-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
System
Management
system
Issue 02 (2017-01-10)
Check Item
Content
Civil air
See
conditioner
document
(optional)
s
delivered
with the
civil air
conditione
r.
Power-on
Hydrogen
commissioni
collector
ng for the
Hydrogen
monitoring
sensor
components
Camera
VCN500
RH2288
server
LAN
switch
ECC500
Independe
ntly
deployed
modules
Water
sensor
Polymer
temperatu
re and
humidity
(T/H)
sensor
Intelligent
battery
monitorin
g module
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
Check Standard
-
The hydrogen density displayed on the
hydrogen collector is 0% or 1%.
The red indicator inside the camera is on.
The green power indicator of the VCN500
is steady on.
If the ACT indicator blinks green, data
transmission is normal.
If the Active indicator of the hard disk
blinks green, data can be read from the
hard disk properly.
The power indicator of the RH2288 server is
normal.
The PWR1, PWR2, and SYS indicators are
on.
The Power indicator on the main control
board is on.
The PWR and RUN indicators on the
MUE and MUS modules are on.
The PWR and RUN indicators are on.
The power indicator is on.
Displays the temperature and humidity values.
The RUN and LINK indicators are on.
41

Advertisement

Table of Contents
loading

Table of Contents