Commissioning Core Components; Commissioning Power Distribution Components; Commissioning The Power Distribution Cabinet - Huawei FusionModule1000B V100R003C00 Commissioning Manual

Water-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
9

9.1 Commissioning Power Distribution Components

9.1.1 Commissioning the Power Distribution Cabinet

Prerequisites
Preparations
Tool: multimeter
Documents: power supply and distribution system diagrams, power supply and distribution
component layout
Skill requirement: power distribution system engineer
Procedure
Step 1 Switch on the input power circuit breaker to power on the PDC.
1.
2.
Step 2 (Optional) Commission the ATS.
Issue 02 (2017-01-10)

Commissioning Core Components

You have verified all the specifications for the power-on.
You have put on protective articles.
For the diagrams, see the initial configuration parameter manual for the solution in use.
The input power circuit breaker refers to the output circuit breaker that controls power supply from
the upstream power distribution equipment to the PDC.
If the indicators (if configured) on the PDC have turned on, the PDC has been powered on.
The general PDC circuit breaker can be an ATS, MCCB, or MCB.
(Optional) If an ATS is configured, go to
(Optional) If an MCCB or MCB is configured, go to
The ATS is an 8D ATS.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Commissioning Core Components
Step
2.
Step
3.
68

Advertisement

Table of Contents
loading

Table of Contents