Procedure
Step 1 Use a hand-held thermometer to measure the temperature inside the container. If the
temperature reading is lower than 5° C in the Equipment Container and lower than 0° C in the
Power Container, perform
Step 2 Start the auxiliary heater to increase the container interior temperature until it reaches the
required normal operating range.
----End
Issue 02 (2017-01-10)
Recommend
ed Power
2 kW
Step
When the auxiliary heater is heating the container, ensure that all container doors are closed to avoid
heat loss and improve the temperature rising speed.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Preparations for Power-On Commissioning
Quantit
Deployment
y
2 PCS
Installed in the cold aisle
in the Power Container.
2; otherwise, no heating is required.