4.2.7.3 (Optional) Installing an ATS Subrack

1.
2.
Issue 01 (2021-02-05)
Figure 4-85 Installing a PDU2000 (in the Converged Cabinet with lithium
batteries)
Install guide rails.
Install the subrack.