Commissioning The Vesda - Huawei FusionModule1000B V100R003C00 Commissioning Manual

Water-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
Figure 9-17 Removing the red pin
Step 4 Reinstall the protective cover of the emergency light.
Step 5 Insert the power plug of the emergency light.
Step 6 Press the red button of the emergency light. The emergency light turns on. When you release
the red button, the emergency light turns off.
Figure 9-18 Red button of the emergency light
(1) Red button of the emergency light
----End

9.6 Commissioning the VESDA

Preparations
Tools: smoke pistol
Issue 02 (2017-01-10)
The emergency light turns off, and the power indicator turns on.
The red button is located at one side of the emergency light.
If the result expected for each step appears, the emergency light is working properly.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Commissioning Core Components
102

Advertisement

Table of Contents
loading

Table of Contents