Optional) Commissioning The Pd510 Electricity Meter - Huawei FusionModule1000B V100R003C00 Commissioning Manual

Water-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
During the 8D ATS power-on commissioning, you are not allowed to modify the ATS initial
configurations unless you are authorized by onsite Huawei engineers.
----End

9.1.1.2 (Optional) Commissioning the PD510 Electricity Meter

Prerequisites
You have powered on the power distribution equipment where the PD510 electricity meter is
installed.
Preparations
Tool: multimeter
Documents: documents delivered with the PD510 electricity meter
Skill requirement: power distribution system engineer
Context
The PD510 electricity meter is used to collect and measure electricity usage.
Procedure
Step 1 Verify configurations of the PD510 electricity meter by referring to the delivered documents.
During the PD510 electricity meter power-on commissioning, you are not allowed to modify
the initial configurations unless you are authorized by onsite Huawei engineers.
Step 2 Set a protection password for the PD510 electricity meter.
Step 3 Set system parameters for the PD510 electricity meter.
Issue 02 (2017-01-10)
The protection password of the PD510 electricity meter can be set to a 4-digit integer ranging from 0000
to 9999. The preset protection password is 1000.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Commissioning Core Components
70

Advertisement

Table of Contents
loading

Table of Contents