Initial Configurations For The Management System - Huawei FusionModule1000B V100R003C00 Commissioning Manual

Water-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
Step 8 After the registration succeeds, a registration success message is displayed; otherwise, the
registration is unsuccessful.
Step 9 Verify that the container door can be opened after you enter the password or scan your
fingerprint.
----End

9.3.3 Initial Configurations for the Management System

After each system of the FusionModule1000 is powered on, initial configuration parameters
for the management system should be configured as planned in the initial configuration table
to ensure the normal operation of the systems.
For details about how to configure the management system, see
Table 9-9 Management system configurations
Document
iManager NetEco
Product Document -
(NetEco Version)
iManager NetEco
Device
Commissioning
Guide - (NetEco
Version)
Issue 02 (2017-01-10)
Password: a numeric string with 4-8 digits.
Fingerprint: from one or two fingers.
A maximum of 5000 users can be registered.
The NetEco version depends on the version in use. Click
NetEco version. If the NetEco version is iManager NetEco V600R007C60, see iManager NetEco
Product Document - (V600R007C60).
Here, the iManager NetEco Commissioning Guide-(V600R007C60) is used as an example.
Item
Installing the
iManager NetEco
management system
Configuring a user
name, password, and
rights
More about NetEco
Configuring an initial
password for the
collector
Configuring a
collector IP address
Adding devices
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Commissioning Core Components
Table
9-9.
on the NetEco WebUI to obtain the
Chapter
Installation and Commissioning >
NetEco Software Initial Installation
Guide
Installation and Commissioning >
NetEco Commissioning Guide >
Preparing for NetEco Commissioning >
Before You Start > Planning
Operating System Users and Their
Initial Passwords
iManager NetEco Product Document -
(NetEco Version)
iManager NetEco Device
Commissioning Guide > Adding
Devices > Commissioning the ECC500
V6 Collector > Setting Monitoring
Parameters for V600R001C01 and
Later Versions > Setting the ECC500
V6 Collector IP Address
iManager NetEco Device
Commissioning Guide > Adding Devices
96

Advertisement

Table of Contents
loading

Table of Contents