Filling Secondary Refrigerant - Huawei FusionModule1000B V100R003C00 Commissioning Manual

Water-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
Skill requirement: cooling engineer
Procedure
Step 1 Switch valves inside and outside the Cooling Container to the secondary refrigerant filling
state. For details, see the pipe system diagram and pipe system valve control relationship
table.
A two-way valve is closed if its handle is perpendicular to the pipe, and is open if its handle is
parallel with the pipe.
Step 2 Open the raised floor under the Power and Equipment Containers using an ESD floor suction
plate.
Step 3 Switch valves inside the Power and Equipment Containers to the secondary refrigerant filling
state. For details, see the pipe system diagram and pipe system valve control relationship
table.
Step 4 Reinstall raised floors in the Power Container and Equipment Container.
----End

4.5.6 Filling Secondary Refrigerant

Prerequisites
Preparations
Tool: step ladder
Documents: pipe system diagram, pipe system valve control relationship table
Skill requirement: cooling engineer
Procedure
Step 1 Start the auxiliary water refill devices to fill secondary refrigerant to the system.
Step 2 Open the automatic exhaust valves on the top of the chilled water tank.
Issue 02 (2017-01-10)
For the diagrams and tables, see the initial configuration parameter manual for the solution in use.
The automatic water refill valves and safety valves have been set as required.
The valves in the cooling system have been switched to the status for filling secondary
refrigerant.
For the diagrams and tables, see the initial configuration parameter manual for the solution in use.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Preparations for Power-On Commissioning
19

Advertisement

Table of Contents
loading

Table of Contents