FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
N+X Power Supply and Distribution System
Figure 6-2 Power-on commissioning process for the N+X power supply and distribution system

6.2 Power-On Commissioning

Prerequisites
Issue 02 (2017-01-10)
You have prepared for the power-on commissioning.
You have verified all the specifications for the power-on.
You have put on protective articles.