Check
Operation Method
Item
Air
Check the connections of air
conditioner
conditioner teamwork and signal
cables.
teamwork
and signal
cable
connections
Air
Check the pipe connections for
conditioner
the air-cooled precision air
pipe
conditioner.
connections
Device
Check the monitoring device
installation
installation and cable connections.
and cable
connections
Device
Check the fire extinguishing
installation
device installation and cable
connections.
and cable
connections
Device
Check the fire extinguishing
installation
device installation and cable
and cable
connections.
connections
Device
Check the lighting device
installation
installation and cable connections.
and cable
connections
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Items to Be Checked Before Power-On
Expected Result
Cables are securely connected
and meet the design
requirements.
The refrigerant circulation
pipeline, humidifier water refill
pipeline, and condensate
drainpipe are properly
installed, and the thermal
insulation layers are intact.
Components are installed
securely at the correct
positions.
Cables are correctly
connected.
The pressure pointer of the
fire cylinder is in the green
zone.
The dowel of the fire
cylinder is properly
installed and intact.
All cables are correctly and
securely connected.
The pressure pointer of the
fire cylinder is in the green
zone.
The safety pins and dowels
of the fire cylinders are
properly installed and
intact.
All cables are correctly and
securely connected.
Components are installed at
the correct positions.
Cables are correctly
connected.