Making The Roughing Pump Connections To The Xevo Tq-S - Waters Xevo TQ-S Operator's, Overview And Maintenance Manual

Mass spectrometry system
Table of Contents

Advertisement

Making the roughing pump connections to the Xevo TQ-S

Required materials
Chemical-resistant, powder-free gloves
7-mm nut driver
The following items are included in the Xevo TQ-S installation kit:
NW25 elbow
NW40 elbow
NW25 center rings
NW40 center rings
NW25 clamps
NW40 clamps
To connect the roughing pumps:
1.
Using an NW25 center ring, attach the NW25 elbow to the turbo
vacuum port of the Xevo TQ-S, and then secure the connection with an
NW25 clamp, tightening it with the 7-mm nut driver, see the figure on
page
B-17.
2.
Using an NW40 center ring, attach the NW40 elbow to the source
vacuum port of the Xevo TQ-S, and then secure the connection with an
NW40 clamp, tightening it with the 7-mm nut driver.
3.
Using an NW25 center ring, attach the free end of the NW25 hose
assembly (attached to the roughing pump) to the NW25 elbow, and then
secure the connection with an NW25 clamp, tightening it with the 7-mm
nut driver.
4.
Using an NW40 center ring, attach the free end of the NW40 hose
assembly (attached to the roughing pump) to the NW40 elbow, and then
secure the connection with an NW40 clamp, tightening it with the 7-mm
nut driver.
B-16
External Connections
The pumps and connections can be contaminated with
Warning:
biohazardous and/or toxic materials. Always wear
chemical-resistant, powder-free gloves when performing this
procedure.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents