LED
Color
COM
PROFIdrive
cyclic
operation
Green
Red
OPT
Green
Red
RDY and
Red
COM
RDY and OPT Orange
Commissioning with Startdrive
Commissioning Manual, 11/2017, 6SL3097-4AA10-0BP1
Display
Description, cause, remedy
Off
Cyclic communication has not (yet) taken place.
Remark:
PROFIdrive is ready for communication when the Control Unit is
ready (see LED RDY).
Continuous light
Cyclic communication is taking place.
Flashing light
Full cyclic communication has not yet taken place.
0.5 Hz
Possible causes:
Flashing light
Bus fault, incorrect parameterization/configuration
0.5 Hz
Remedy: Adapt configuration between master/controller and
CU.
Flashing light
Cyclic bus communication has been interrupted or could not be
2 Hz
established.
Remedy: Correct fault.
Off
Electronics power supply is missing or outside permissible toler-
ance range.
Component is not ready.
Option board not installed or no associated drive object has
been created.
Remedy: Check power supply and/or component
Continuous light
Option board is ready.
Flashing light
Depends on the option board used.
0.5 Hz
Flashing light
This component has at least one fault.
2 Hz
The Option Board is not ready (e.g. after switching on).
Remedy: Correct fault and acknowledge.
Flashing light
Bus fault, communication has been interrupted
2 Hz
Remedy: Correct fault.
Flashing light
Firmware update in progress for connected Option Board
0.5 Hz
CBE20.
The controller is not transferring any setpoints.
During isochronous operation, no global control (GC) or a
faulty global control (GC) is transferred by the controller.
Only possible for CU320-2 PN: "Shared Device" is selected
(p8929=2) and only one controller connected.
Diagnostics