Sign In
Upload
Manuals
Brands
JCM GLOBAL Manuals
Bank Note Validator
UBA Pro Series
JCM GLOBAL UBA Pro Series Manuals
Manuals and User Guides for JCM GLOBAL UBA Pro Series. We have
1
JCM GLOBAL UBA Pro Series manual available for free PDF download: Operation And Maintenance Manual
JCM GLOBAL UBA Pro Series Operation And Maintenance Manual (132 pages)
Universal Banknote Acceptor
Brand:
JCM GLOBAL
| Category:
Bank Note Validator
| Size: 11.93 MB
Table of Contents
Uba™ Pro Series
3
Table of Contents
3
List of Figures
10
Description
17
UBA™ Pro Series
17
Universal Banknote Acceptor
17
UBA Pro Unit
17
1 General Information
17
Type Descriptions
18
Software Descriptions
18
Precautions
18
User Cautions
19
Installation Cautions
19
Mounting, Dismounting & Transportation
19
Operation Cautions
19
Preventive Maintenance
19
Disposal Considerations
20
Banknote Fitness Requirements
20
Model Descriptions
18
Primary Features
20
Component Names
21
Specifications
22
Technical Specifications
22
Environmental Specifications
23
Electrical Specifications
23
Structural Specifications
23
Unit Dimensions
24
UBA Pro with Standard 500 Note Cash Box Outside Dimension
24
UBA Pro with Standard or ICB 900 Note Cash Box Outside Dimension
25
UBA Pro with ICB 500 Note Cash Box Outside Dimension
26
Installation and Maintenance Space Requirements
26
Technical Contact Information
27
Americas
27
JCM American
27
Europe, Middle East, Africa & Russia
27
JCM Europe Gmbh
27
UK & Ireland
27
JCM Europe (UK Office)
27
Asia and Oceania
27
Japan Cash Machine Co., Ltd. (Hq)
27
JCM Gold (HK) Ltd
27
Installation Process
29
Grounding
29
Side Installation
29
Rear Installation
30
Transport Stand Protector Installation (for Stacking up (SU) Installation Type)
30
Bezel Installation
30
External Harness Installation
31
Cash Box Lock Installation
31
Unlock Procedure
31
2 Installation
29
DIP Switch Configurations
32
Denomination Acceptance Settings (DIP Switches at the Front)
32
SW1 and SW2 Configurations
32
Interface and Recycler Settings (Sub Board 2)
32
Interface Settings (Sub Board 1)
32
LED Light Flashing Pattern
33
Recommended Wire
34
With JCM External Harness
34
Not Using JCM External Harness
34
Connector Pin Assignment
35
Sub Board 1: USB Connector Pin Assignment
35
Sub Board 1: Photo-Coupler Isolation Connector Pin Assignment
36
Sub Board 1: RS232C Connector Pin Assignment
37
Sub Board 1: TTL Connector Pin Assignment
38
Sub Board 2: USB Connector Pin Assignment
39
Sub Board 2: Photo-Coupler Isolation Connector Pin Assignment
40
Sub Board 2: RS232C Connector Pin Assignment
41
Sub Board 2: CC-Talk Connector Pin Assignment
42
Sub Board 2: TTL Connector Pin Assignment
43
CN5 Bezel Connector Pin Assignments
43
Preventive Maintenance
44
Collecting Banknotes
44
Clearing a Banknote Jam
44
Opening the Centering Mechanism
44
Cleaning Procedure
45
Sensor and Roller Locations
46
Operational Flowcharts
53
Initialization and Banknote Acceptance Flowchart
53
Validation Flowchart
54
Collecting Flowchart
55
3 Communications
57
Americas
57
Asia and Oceania
57
Europe, Middle East, Africa & Russia
57
Japan Cash Machine Co., LTD. (HQ)
57
JCM American
57
JCM Europe (UK Office)
57
JCM Europe Gmbh
57
JCM Gold (HK) Ltd
57
UK & Ireland
57
Tool Requirements
59
UBA Pro and Cash Box Removal
59
LED Light Module and Upper Bar Sensor Removal
59
4 Disassembly/Reassembly
59
Box Sensor Removal
60
Sub Board Removal
60
Main Board Removal
61
Entrance Motor Harness Assy. Removal
63
Centering HP Board Removal
63
Figure 4-21 Centering HP Board Removal 1
63
Figure 4-22 Centering HP Board Removal 2
63
PB Encoder HP Board Removal
64
PB Motor Harness Assy. Removal
64
Figure 4-24 PB Encoder HP Board Removal 1
64
Figure 4-25 PB Encoder HP Board Removal 2
64
Figure 4-26 PB Encoder HP Board Removal 3
64
Figure 4-27 PB Motor Harness Assy. Removal 1
64
Figure 4-28 PB Motor Harness Assy. Removal 2
64
Figure 4-29 PB Motor Harness Assy. Removal 3
64
Figure 4-30 Stack Motor Harness Assy. Removal 1
65
Figure 4-31 Stack Motor Harness Assy. Removal 2
65
Figure 4-32 Stack Motor Harness Assy. Removal 3
65
PDIC Array Removal
66
Figure 4-38 PDIC Array Removal 1
66
Figure 4-39 PDIC Array Removal 2
66
Slide Roller Removal
67
Figure 4-40 PDIC Array Removal 3
67
Figure 4-41 PDIC Array Removal 4
67
Figure 4-42 Lower BAR Sensor Removal
67
Figure 4-43 Slide Roller Removal 1
67
Figure 4-44 Slide Roller Removal 2
67
Lower BAR Sensor Removal
67
Tool Requirements
71
Installation Procedures
71
Part 1 - JCM Tool Suite Installation
71
Figure 6-1 Tool and Harness Connections
71
Part 2 - USB Drivers Installation
72
6 Calibration and Testing
71
JCM Tool Suite Standard Edition Mode
73
Software Download
73
Figure 6-9 Normal Mode Selection
73
Figure 6-10 Test Mode Selection
73
Figure 6-14 Software Download (Initial) 2
74
Figure 6-15 Software Download 3
74
Figure 6-16 Software Download 4
74
Figure 6-17 Software Download 5
74
Figure 6-18 Software Download 6
74
Figure 6-19 Software Download 7
74
Calibration
75
When to Calibrate
75
Placing Reference Paper
75
Sensor Calibration
75
Figure 6-20 KS-101 Reference Paper
75
Figure 6-22 Placing Reference Paper 2
75
Performance Test Using a PC
78
List of UBA Pro Performance Tests
78
Launch Performance Test Program
78
Banknote Acceptance Test with Cash Box
78
Banknote Acceptance Test Without Cash Box
79
Non-Validation Banknote Acceptance Test with Cash Box
79
Non-Validation Banknote Acceptance Test Without Cash Box
79
Non-Validation Banknote Reject Test with Cash Box
79
Feed Motor Speed Test (Forward)
80
Feed Motor Speed Test (Reverse)
80
Sensor Test
81
Aging Test
81
DIP Switch Test
81
Stacker Motor Operation Time Test
82
PB Motor Operation Time Test
82
Centering Motor Operation Time Test
83
Stacker Motor Operation Test
83
Entrance Motor Speed Test (Forward)
84
Entrance Motor Speed Test (Reverse)
84
Entrance and Feed Motors Simultaneous Speed Test (Forward)
85
Entrance and Feed Motors Simultaneous Speed Test (Reverse)
85
Performance Test Without a PC
86
List of the Performance Tests Without a PC
86
Banknote Acceptance with Cash Box
87
Banknote Acceptance Without Cash Box
87
Non-Validation Banknote Acceptance with Cash Box
88
Non-Validation Banknote Acceptance Without Cash Box
88
Non-Validation Banknote Reject Test with Cash Box
89
Feed Motor Operation Test (Forward)
89
Feed Motor Operation Test (Reverse)
90
Sensor Test
90
Aging Test with Cash Box
91
DIP Switch Test
91
Stacking Operation Test
92
PB Motor Operation Test
93
Centering Motor Operation Test
93
Stacker Motor Operation Test
94
Entrance Motor Operation Test (Forward)
94
Entrance Motor Operation Test (Reverse)
95
Entrance and Feed Motors Simultaneous Operation Test (Forward)
95
Entrance and Feed Motors Simultaneous Operation Test (Reverse)
96
UBA Pro Entire Unit Exploded View
97
Figure 7-1 UBA Pro Entire Unit Exploded View
97
UBA Pro Entire Unit Parts List
98
7 Exploded Views and Parts Lists
97
UBA Pro Upper Transport Guide Exploded View
99
Figure 7-2 UBA Pro Upper Transport Guide Exploded View
99
UBA Pro Upper Transport Guide Parts List
100
UBA Pro Transport Unit Exploded View 1
101
Figure 7-3 UBA Pro Transport Unit Exploded View 1
101
UBA Pro Transport Unit Parts List 1
102
UBA Pro Transport Unit Exploded View 2
103
UBA Pro Transport Unit Parts List 2
103
Figure 7-4 UBA Pro Transport Unit Exploded View 2
103
UBA Pro Transport Unit Exploded View 3
104
UBA Pro Transport Unit Parts List 3
104
Figure 7-5 UBA Pro Transport Unit Exploded View 3
104
UBA Pro Transport Unit Exploded View 4
105
UBA Pro Transport Unit Parts List 4
105
UBA Pro Transport Unit Exploded View 5
106
Figure 7-7 UBA Pro Transport Unit Exploded View 5
106
UBA Pro Transport Unit Parts List 5
107
UBA Pro Transport Unit Exploded View 6
108
UBA Pro Transport Unit Parts List 6
108
UBA Pro Middle Bracket Exploded View
109
Figure 7-9 UBA Pro Middle Bracket Exploded View
109
UBA Pro Middle Bracket Parts List
110
UBA Pro Bottom Cover Exploded View
111
UBA Pro Bottom Cover Parts List
111
Figure 7-10 UBA Pro Bottom Cover Exploded View
111
8 Index
113
A Troubleshooting
115
Introduction
115
Troubleshooting Overview
115
Fault Table Listings
115
Standard and ICB Error and Reject Code Conditions
118
Standard Error Code Conditions
118
ICB Error Code Conditions
120
LED Flash Reject Error Code Conditions; Banknotes
120
LED Flash Reject Error Code Conditions; Barcode Tickets
122
Calibration Error
124
Calibration Program Error Codes
124
Figure A-1 Calibration Error Code Pop-Up Screen
124
Calibration Error Codes; Position Sensor
125
Calibration Error Codes; Validation Sensor
127
Calibration Error Codes; Barcode Sensor
128
Maintenance Equipment
128
Reference Paper Handling
128
Figure A-2 Additional Maintenance Equipment Requirements
128
B Glossary
129
Advertisement
Advertisement
Related Products
JCM GLOBAL UBA Pro RT Series
JCM GLOBAL UBA Pro RQ Series
JCM GLOBAL UBA Series
JCM GLOBAL UBA-12-SS
JCM GLOBAL UBA-14-SS
JCM GLOBAL UBA-x4-SS Series
JCM GLOBAL UBA-10-SS
JCM GLOBAL UBA-x4-SU Series
JCM GLOBAL UBA-25-SU
JCM GLOBAL UBA-24-SU
JCM GLOBAL Categories
Bank Note Validator
Industrial Equipment
Tools
Banknote Counter
Cash Register
More JCM GLOBAL Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL