Download Print this page

KidKraft Cedar Summit Adventure Ridge Playset Installation And Operating Instructions Manual page 77

Hide thumbs Also See for Cedar Summit Adventure Ridge Playset:

Advertisement

Step 34: Monkey Rail Assembly
Part 1
Pre-drill all pilot holes using a 1/8" drill bit before installing Wood Screws.
A: Insert 5 (341) Dowels into both (342) Tunnel MK Rail Right and (343) Tunnel MK Rail Left. (Fig. 34.1and 34.2)
B: Make sure shoulder of dowel is against each rail before predrilling pilot holes. Drill 1/8" pilot holes through the
rails and into the dowels to prevent splitting. (Fig. 34.4)
C: Attach (341) Dowels to both rails with 2 (S4) #8 x3" Wood Screws per dowel. (Fig. 34.3)
D: Attach 1 (H5) Hex Bolt (with lock washer, flat washer and t-nut) to (343) Tunnel MK Rail Left and (342) Tunnel
MK Rail Right. IMPORTANT! MAKE SURE THE BOLT IS ATTACHED TO MINIMIZE CHECKING OF WOOD.
(Fig. 34.1)
Fig. 34.1
343
342
Fig. 34.2
Fig. 34.3
Wood Parts
1 x
Tunnel MK Rail Right 1-3/8 x 4-1/2 x 90-1/4"
342
1 x
Tunnel MK Rail Left 1-3/8 x 4-1/2 x 90-1/4"
343
5 x
Tennon Dowel 1-1/8 x 15-7/8"
341
341
S4
10 x
1/4" Lock
Washer
1/4" Flat
Washer
Make sure the
T-Nuts are on
this side
S4
Hardware
S4
#8 x 3" Wood Screw
77
H5
1/4"
T-Nut
Fig. 34.4
341
Fig. 1.2
S4
Rail

Hide quick links:

Advertisement

loading