Download Print this page
KidKraft Cedar Summit Adventure Ridge Playset Installation And Operating Instructions Manual
KidKraft Cedar Summit Adventure Ridge Playset Installation And Operating Instructions Manual

KidKraft Cedar Summit Adventure Ridge Playset Installation And Operating Instructions Manual

Hide thumbs Also See for Cedar Summit Adventure Ridge Playset:

Advertisement

A D V E N T U R E R I D G E P L AY S E T - F 2 5 7 3 0
Adventure Ridge
INSTALLATION AND OPERATING INSTRUCTIONS
Costco.com 2018
Safety Zone
6.3m
5.4m
10.3m
10 - 12 Hrs
10 - 12 Hrs
2-4 Hrs
Approx. 2 Hrs
FOR FORT & SWING
FOR FORT & SWING
TUBE SLIDE
TWO PERSON
ASSEMBLY
By
Rev 02/02/2018
WARNING
OBSTACLE FREE SAFETY ZONE -33'2" x 30'10" (10.3 x 9.4 m) area requires Protective Surfacing. See page 3.
9.4m
MAXIMUM VERTICAL FALL HEIGHT - 6' 7" (2.01 m)
CAPACITY - 15 Users Maximum, Ages 3 to 10; Weight Limit 110 lbs. (49.9 kg) per child.
RESIDENTIAL HOME USE ONLY. Not intended for public areas such as multi-unit residences, schools,
churches, nurseries, day cares or parks.
Cedar Summit by KidKraft
4630 Olin Road
Dallas, TX 75244, United States
customersupport@kidkraft . c om
Online Parts Replacement:
Cedarsummitplay . c om/parts-center-warranty-claim
Customer Service:
1(800) 933-0771 or (972) 385-0100
KidKraft Netherlands BV
Olympisch Stadion 29
1076DE Amsterdam, The Netherlands
Europe Customer Service: +31 (0)20 305 8620
europecustomerservice@kidkraft . c om
EU Online Parts Replacement: parts . k idkraft . e u
To reduce the risk of serious injury or death, you must
read and follow these instructions. Keep and refer to these
instructions often and give them to any future owner of this
play set. Manufacturer contact information provided below.

Table of Contents

Warnings and Safe Play Instructions . . . . . . . . . . . . . pg . 2
Protective Surfacing Guidelines . . . . . . . . . . . . . . . . . . pg . 3
Instructions for Proper Maintenance . . . . . . . . . . . . pg . 4
About Our Wood - Limited Warranty . . . . . . . . . . . .pg . 5
Keys to Assembly Success . . . . . . . . . . . . . . . . . . . . . . . pg . 6
Part ID . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pg . 8
Step-By-Step Instructions . . . . . . . . . . . . . . . . . . . . . pg . 19
Installation of I . D . / Warning Plaque . . . . . . . . . F inal Step
10 - 12 Hrs
FOR FORT & SWING
TWO PERSON
ASSEMBLY

Advertisement

loading

Summary of Contents for KidKraft Cedar Summit Adventure Ridge Playset

  • Page 1: Table Of Contents

    TWO PERSON ASSEMBLY Table of Contents Cedar Summit by KidKraft 4630 Olin Road Dallas, TX 75244, United States Warnings and Safe Play Instructions . . . . . . . . . . . . . pg . 2 customersupport@kidkraft .
  • Page 2: Warnings And Safe Play Instructions

    Warnings and Safe Play Instructions CONTINUOUS ADULT SUPERVISION REQUIRED. Most serious injuries and deaths on playground equipment have occurred while children were unsupervised! Our products are designed to meet mandatory and voluntary safety standards. Complying with all warnings and recommendations in these instructions will reduce the risk of serious or fatal injury to children using this play system.
  • Page 3: Protective Surfacing Guidelines

    Protective Surfacing - Reducing Risk of Serious Head Injury From Falls One of the most important things you can do to reduce the likelihood of serious head injuries is to install shock-absorbing protective surfacing under and around your play equipment. The protective surfacing should be applied to a depth that is suitable for the equipment height in accordance with ASTM F1292.
  • Page 4: Instructions For Proper Maintenance

    Instructions for Proper Maintenance Your Cedar Summit Play System is designed and constructed of quality materials with your child’s safety in mind. As with all outdoor products used by children, it will weather and wear. To maximize the enjoyment, safety and life of your Play Set, it is important that you, the owner, properly maintain it.
  • Page 5: About Our Wood - Limited Warranty

    Such use may lead to product failure and potential injury. Any and all public use will void this warranty. Cedar Summit by KidKraft disclaims all other representations and warranties of any kind, express or implied province to province. This warranty excludes all consequential damages, however, some states do not allow the...
  • Page 6: Keys To Assembly Success

    Keys to Assembly Success Tools Required • Tape Measure • #1, #3 Phillips or Robertson • Open End Wrench • 3/16” Hex Key • Carpenters Level bit or Screwdriver (1/2”, 7/16” & 9/16”) • 8’ Step Ladder • Carpenters Square •...
  • Page 7 Your Key To Quick Assembly SORTING WOOD PARTS INTO EACH ASSEMBLY STEP WILL SAVE TIME! Step Step Step SAVE TIME - TIP #1: Open each box with wood parts and look for the Key Number stamped on the end of the wood part (see chart below). Sort each wood part into the different assembly steps.
  • Page 9 0891 0890...
  • Page 10 Part Identification (Reduced Size) (2) 102 - 5/8 x 1-1/4 x 33-7/8" - Side Rope Trim - Box 2 - 3609174 (1) 105 - 5/8 x 2 x 21-49/64" - Top Front Rope - Box 2 - 3609171 (1) 103 - 5/8 x 2-25/64 x 34" - Left Rope - Box 2 - 3609172 (1) 104 - 5/8 x 3-5/8 x 34"...
  • Page 11 Part Identification (Reduced Size) (16) 346 - 1 x 5 x 16-7/8" - Floor Board - Box 4 - 3599092 (1) 345 - 1 x 5 x 16-7/8" - Floor Board End A - Box 2 - 3599184 (2) 651 - 1 x 5 x 14-1/2" - Transom Board A - Box 2 - 3599115 (2) 652 - 1 x 5 x 10"...
  • Page 12 Part Identification (Reduced Size) (6) 341 - 1-1/8 x 15-7/8" - Dowel - Tennon - Box 4 - 3681578 (4) 351 - 1-1/8" x 18-5/8" - Dowel - Tennon - Box 4 - 3681858 (2) 205 - 1-1/4 x 2 x 27-1/2" - Crowsnest Spacer - Box 2 - 3599043 (4) 501 - 1¼...
  • Page 13 Part Identification (Reduced Size) (1) 396 - 1-3/8 x 4-1/2 x 16-47/64" - Tunnel Rail - Box 4 - 3599187 (2) 394 - 1-3/8 x 4-1/2 x 18-3/4" - Safety Rail - Box 4 - 3592922 (2) 371 - 1-3/8 x 3-3/8 x 33" - Access Upright - Box 4 - 3592917 (2) 354 - 1-3/8 x 2-1/2 x 53"...
  • Page 14 Part Identification (Reduced Size) (1) 031 - 1-1/4 x 43 x 92" (1) 022 - 1-1/4 x 37 x 92" (1) 032 - 1-1/4 x 37 x 92" Panel Front Wall Slide End Panel SW Wall Panel Box 2 - 37599135 Box 3 - 37598981 Box 3 - 37599007 (1) 121 - 1-1/4 x 15-3/4 x 42-1/8"...
  • Page 15 Part Identification (Reduced Size) (1) 553 Back Small Roof 1-1/4 x 28-15/16 x 21-7/8" - (1) 552 Front Small Roof 1¼ x 29 3/16 x 21-7/8" - Box 3 - 37599091 Box 3 - 37599098 (1) 512 Back Roof Panel 1-1/4 x 32¼ x 45" - Box 3 - (1) 511 Front Roof Panel 1¼...
  • Page 16 Hardware Identification (Actual Size) (22) FW0 - 3/16" Flat Washer - (51103100) (3) LW2 - 5/16" Lock Washer - (51303300) (69) LW1 - 1/4" Lock Washer - (51303200) (47) TN1 - 1/4" T - Nut (54503200) (53) FW1 - 1/4" Flat Washer - (51103200) 1/4 Lock Nut (132) LN1 - - (54303200)
  • Page 17 Hardware Identification (Actual Size) Wafe Bolt 5/16 x 2-1/8" (6) WB9 - - (53613324) 1/4 x 1-3/8" (6) WL3 - Wafer Lag - (52613216) Wafer Bolt 5/16 x 2-3/8" (1) WB8 - - (53613326) 1/4 x 2-1/2" (18) WL5 - Wafer Lag - (52613222) Wafer Bolt 5/16 x 2-5/8"...
  • Page 18 Part Identification (Reduced Part Size) 1x - Cedar Summit Plaque 1x - TNR3 Tube Support (9320358) (9200258) 1x - Kidkraft ID Paque (9320370) 1x - Telescope w/ Mount (3320161) 1x - TNR4 Post Mount (9203655) 1x - Plastic Formed Washer (18 Pk)
  • Page 19: Step-By-Step Instructions

    Europe Customer Service: +31 (0)20 305 8620 Online Parts Replacement: europecustomerservice@kidkraft.com Cedarsummitplay.com/parts-center-warranty-claim EU Online Parts Replacement: parts.kidkraft.eu Customer Service: 1(800) 933-0771 or (972) 385-0100 Read the assembly manual completely, paying special attention to ANSI warnings; notes; and safety/maintenance information on pages 1 - 6.
  • Page 20 Step 2: Slide Wall Assembly A: Place (021) Narrow Back Panel against the left side of (022) Slide End Panel noticing panel orientation. The tops and bottoms of the panels should be flush and panels square. Pre-drill with a 3/16” drill bit, then fasten (021) Narrow Back Panel to (022) Slide End Panel with 4 (WL5) 1/4 x 2-1/2”...
  • Page 21 Step 3: Swing Wall Assembly A: Place (031) Front Wall Panel against the left side of (032) SW Wall Panel noticing panel orientation. The tops and bottoms of the panels should be flush and panels square. Pre-drill with a 3/16” drill bit, then fasten (031) Front Wall Panel to (032) SW Wall Panel with 4 (WL5) 1/4 x 2-1/2”...
  • Page 22 Step 4: Join Swing and Slide Wall Assemblies Part 1 A: With at least two helpers lift the Slide Wall Assembly and Swing Wall Assembly so the (021) Narrow Back Panel and (023) Narrow Front Panel meet with (033) Back Rock Panel and (031) Front Wall Panel and are tight together as shown in (fig.
  • Page 23 Step 4: Join Swing and Slide Wall Assemblies Part 2 C: From inside the assembly, tight to both (022) Slide End Panel and (032) SW Wall Panel, halfway up the assembly, 5/8” below the panel, loosely attach 1 (043) Side Joist to (021) Narrow Back Panel and (033) Back Rock Panel with 3 (WB10) 5/16 x 2-5/8”...
  • Page 24 Step 4: Join Swing and Slide Wall Assemblies Part 3 E: From inside the assembly, place 1 (044) Tie centred between (021) Narrow Back Panel and (033) Back Rock Panel so it is flush to the tops of the panels and the angled ends face out then attach with 2 (H10) 1/4 x 2-1/4” Hex Bolts (with lock washer, flat washer and t-nut) and 2 (S11) #8 x 2”...
  • Page 25 Step 4: Join Swing and Slide Wall Assemblies Part 4 G: On the inside of the assembly attach (021) Narrow Back Panel to (033) Back Rock Panel using 2 Flat Panel Brackets in the places shown with 4 (S8) #12 x 3/4” Pan Screws per bracket. (fig. 4.9 & 4.10) H: Repeat Step G to attach (023) Narrow Front Panel to (031) Front Wall Panel.
  • Page 26 Step 5: Floor Assembly Part 1 A: Place 1 (051) Floor Board tight to (022) Slide End Panel and 1 tight to (032) SW Wall Panel then attach each to the (043) Side Joists with 6 (S20) #8 x 1-3/8” Wood Screws per board. (fig. 5.1 & 5.2) B: Place (052) Long Floor Joist tight to the bottom of each (051) Floor Board, centred over the pilot holes on the (022) Slide End Panel and (032) SW Wall Panel then attach with 2 (S4) #8 x 3”...
  • Page 27 Step 5: Floor Assembly Part 2 C: Measure the distance from the Back Wall to the Front Wall from the inside of the panels to make sure it equals 35-3/4”. Maintain this measurement when installing the floor boards. Starting at the Slide Wall place 3 (051) Floor Boards tight to the previously attached (051) Floor Board, followed by 1 (053) Narrow Floor Board then 8 more (051) Floor Boards.
  • Page 28 Step 6: Attach Wall Tops Part 1 A: In the opening of (032) SW Wall Panel, from the inside, attach (061) SW Wall Top, tight to the corner of the panels with overhang facing in with 1 (S11) #8 x 2” Wood Screw at each end as shown in (fig. 6.1 & 6.3) B: Attach (061) SW Wall Top to slat in (032) SW Wall Panel with 1 Corner Bracket using 3 (S37) #7 x 5/8”...
  • Page 29 Step 6: Attach Wall Tops Part 2 E: Place (063) Table Support flush to the notched out ends of (064) Table Top and attach with 4 (S7) #12 x 2” Pan Screws as shown in (fig. 6.4 & 6.6). F: Place Table Top Assembly tight in the opening of (031) Front Wall Panel and attach (063) Table Support to (031) Front Wall Panel with 2 (S3) #8 x 2-1/2”...
  • Page 30 Step 7: Attach Diagonals Part 1 A: Loosely attach (071) SW Ground to (072) Diagonal with 1 (WB9) 5/16 x 2-1/8” Wafer Bolt (with flat washer and t-nut) then place (072) Diagonal tight and flush to the front of (031) Front Wall Panel. (071) SW Ground to be flush to the bottom of (032) SW Wall Panel.
  • Page 31 Step 7: Attach Diagonals Part 2 D: Loosely attach (073) Support Diagonal to (074) Diagonal with 1 (WB9) 5/16 x 2-1/8” Wafer Bolt (with flat washer and t-nut) then place (072) Diagonal tight and flush to the front of (033) Back Rock Panel. The (073) Support Diagonal should be flush to the bottom of (032) SW Wall Panel.(fig.
  • Page 32 Step 8: Vertical Rock Wall Assembly Part 1 Note: It is important to follow board orientation closely. A: Arrange Vertical Rock Boards with the bevel at the top as shown in (fig. 8.1) and attach all 22 rocks using 1 (PB2) ¼...
  • Page 33 Step 8: Vertical Rock Wall Assembly Part 2 B: Make sure that it is tight to the (074) Diagonal and tight to the bottom attach 1 (081) Vertical Rock Board A2 using 6 (S20) #8 x 1-3/8” Wood Screws.(Fig. 8.3 & 8.4) C: Tight to Vertical Board A2 attach (082) Vertical Board B2 followed by Vertical Boards C2 and D2 (083 and 084) using 6 (S20) #8 x 1-3/8”...
  • Page 34 Step 8: Vertical Rock Wall Assembly Part 3 Note: It is important to follow board orientation closely. D: Place (085) Vertical Rock Board A1 directly above (081) Vertical Rock Board A2 making sure that the beveled edges are at the top and that the boards are tight together and flush to the edge. Attach using 6 (S?) #8 x 1-3/8” Wood Screws.
  • Page 35 Step 8: Vertical Rock Wall Assembly Part 4 F: In the lower opening place 2 (089) Vertical Rock Board Short A’s side by side and tight to Vertical Rock Board D2. Attach using 6 (S20) #8 x 1-3/8” Wood Screws per board. (Fig 8.9 & 8.7) G: Tight to (089) Vertical Rock Board Short A place 1 (0890) Vertical Rock Board Short Wide making sure that the hole is at the bottom.
  • Page 36 Step 9: Attach Bell A: Centre Horseshoe Mount at the top of Vertical Rock Board C and attach with 4 (S0) #8 x 7/8” Truss Screws. (fig. 9.1 & 9.2) B: Thread the Steel Clapper Line through the Bolt. Slide Bell under overhang of Horseshoe Mount then insert Bolt up through Bell and Horseshoe Mount then secure with Nut.
  • Page 37 Step 10: Install Climbing Rope Part 1 A: Tie a knot in one end of the rope. (Fig. 10.4) B: Position (101) Top Rope so that the notched out side is facing up. Place the rope so that it sits in the notch then at the top of the opening in the Vertical Wall place (101) Top Rope tightly against the underside of the panel.
  • Page 38 Step 10: Install Climbing Rope Part 2 G: On the inside edge of the opening on the Vertical Climbing Wall attach 1 (102) Side Rope Trim to each side using 3 (S20) #8 x 1-3/8” Wood Screws per side. (fig. 10.5) H: On the left side of the front face of the opening place 1 (103) Left Rope Green so that it’s flush to the edge of the (102) Side Rope Trim and attach using 3 (S20) #8 x 1-3/8”...
  • Page 39 Step 10: Install Climbing Rope Part 3 J: Along the top of the opening, tight to the top of the left and right Rope Greens attach 1 (105) Top Front Rope using 6 (S20) #8 x 1-3/8” Wood Screws. (fig. 10.7) Fig.
  • Page 40 Step 11: Attach Hand Grip/Rail A: On the left side of the Vertical Rock Wall opening centre 1 Steel Hand Grip then pre-drill with a 1/8” drill bit. Attach Steel Hand Grip with 2 (WL3) 1/4 x 1-3/8” Wafer Lags (with flat washer). (fig. 11.1 & 11.3) B: On the right side of the Vertical Rock Wall opening place 1 long Steel Hand Grip so the top is sitting on the (104) Right Rope and the bottom is sitting on the (0891) Vert Board Short as shown in fig.
  • Page 41 Step 12: Door Panel Assembly Part 1 A: On the inside of (121) Door Window Panel measure 15” up from the bottom and attach Catch Plate flush to the edge using 2 (S38) #7 x 1-1/8” Pan Screws. (fig. 12.1 & 12.2) B: On the inside of (121) Door Window Panel measure 22”...
  • Page 42 Step 12: Door Panel Assembly Part 2 C: On the outside of the (121) Door Window Panel attach the second Door Handle at approximately the same place as the one on the inside. Use 2 (S37) #7 x 5/8” Pan Screws. (fig. 12.3) D: Attach 2 Door Hinges on the outside of the (121) Door Window Panel on the opposite side from the Door Handle.
  • Page 43 Step 12: Door Panel Assembly Part 3 E: In the opening for the door, measure 3/4” from the top and bottom of (023) Narrow Front Panel and maximum 5/8” from left side of the opening which would be the Door Hinge side and attach the remaining side of the hinges to (023) Narrow Front Panel using 3 (S37) #7 x 5/8”...
  • Page 44 Step 12: Door Panel Assembly Part 4 F: In the notched out opening of (122) Door Stop attach the Magnetic Catch using 2 (S38) #7 x 1-1/8” Pan Screws. (fig. 12.7) Important: Use a hand held screw driver and DO NOT over tighten. G: On the inside of the assembly, attach (122) Door Stop to (023) Narrow Front Panel with 3 (S11) #8 x 2”...
  • Page 45 Step 13: Bell Support Assembly A: Place (131) Bell Top on top of (132) Bell Support so the angled and back edges are flush then attach with 3 (S20) #8 x 1-3/8” Wood Screws. Repeat by attaching (133) Bell Top Right to top of (132) Bell Support. Rounded ends of (131) Bell Top and (133) Bell Top RT are at the bottom.
  • Page 46 Step 14: Swing Beam Assembly Part 1 A: Attach 6 Heavy Duty Swing Hangers to (141) Engineered SW Beam using 2 (G13) 5/16 x 6-1/8” Hex Bolt (with 2 flat washers, plastic formed washer and lock nut) per swing hanger, as shown in (fig. 14.1 and 14.2). B: Attach 1 Spring Loaded Quick Link to each Heavy Duty Swing Hanger.
  • Page 47 Step 14: Swing Beam Assembly Part 2 E: On the Fort End of (141) Engineered SW Beam attach 2 Heavy Flat Brackets with 2 (G21) 5/16 x 3-3/4” Hex Bolts (with 2 flat washers and 1 lock nut). (fig. 14.6 and 14.7) F: Place (142) SW Mount in between both Heavy Flat Brackets and place 1 Heavy L-Bracket against (141) Engineered SW Beam and (142) SW Mount.
  • Page 48 Step 15: Swing Post Assembly Part 1 Heavy L-Bracket Note: Keep all bolts from Step 15 series loose Fig. 15.1 until start of Step 17 Bottom View A: Place (151) SW Block Angle on top of (152) Block SW and attach 2 Heavy L-Brackets on top of (151) SW Block Angle feeding 2 (G17) 3/8 x 6”...
  • Page 49 Step 15: Swing Post Assembly Part 2 D: Place Swing End of (141) Engineered SW Beam in between Heavy L-Brackets assembled in Step A making sure holes are lined up then attach Swing Post Assembly to Swing Beam Assembly using 1 (G20) 3/8 x 4” Hex Bolt (with 2 flat washers and lock nut) through Heavy L-Bracket.
  • Page 50 Step 15: Swing Post Assembly Part 3 F: Place (142) SW Mount flush to the top of (032) SW Wall Panel. Attach with 1 (G5) 5/16 x 4-1/2” Hex Bolt (with lock washer, flat washer and t-nut) in the bottom hole from outside the assembly and 1 (G5) 5/16 x 4-1/2” Hex Bolt (with 2 x flat washer and 1 lock nut) in the top hole from inside the assembly.
  • Page 51 Step 16: Attach Cross Support Pre-drill all holes using a 3/16” drill bit before installing the lag screws. Fig. 16.1 A: To adjust for uneven ground, raise or lower the (161) Support Cross on the (153) SW Post. Make sure the Support Cross is level prior to attaching with the lag screws.
  • Page 52 Step 17: Final Swing Post Assembly Pre-drill all holes using a 3/16” drill bit before installing the lag screws. Note: Tighten all bolts from Step 15 series before installing lag screws. A: Attach 1 (LS9) 5/16 x 4-3/4” Lag Screw (with flat washer) into each (153) SW Post, as shown in fig. 17.1. B: Attach 1 (LS9) 5/16 x 4-3/4”...
  • Page 53 Step 18: Install Ground Stakes MOVE FORT TO FINAL LOCATION PRIOR TO STAKING FINAL LOCATION MUST BE LEVEL GROUND A: In the 4 places shown in (fig.18.1) drive the Rebar Ground Stakes 13” into the ground against (072) Diagonal, (074) Diagonal, and both (153) SW Posts. Be careful not to hit the washer while hammering stakes into the ground as this could cause the washer to break off.
  • Page 54 Step 19: Lower Crowsnest Assembly Part 1 A: Attach 1 (191) Crowsnest Gusset to 1 (192) Crowsnest Joist so the bottoms and ends are flush with 1 (S7) #12 x 2” Pan Screw. Repeat to make a second set with the (192) Crowsnest Joist on the opposite side from the first.
  • Page 55 Step 19: Lower Crowsnest Assembly Part 2 B: Place (193) Crowsnest Back against the ends of (192) Crowsnest Joists so the tops are flush then attach with 4 (S3) #8 x 2-1/2” Wood Screws. (fig. 19.3 and 19.4) Fig. 19.3 Flush Flush Fig.
  • Page 56 Step 20: Upper Crowsnest Assembly Part 1 A: Loosely attach (201) Crowsnest Top to 2 (202) Upright Crowsnest using 2 (WB9) 5/16 x 2-1/8” Wafer Bolts (with flat washer and t-nut). The distance between uprights must be 25-1/2”. (fig. 20.1) B: Loosely attach (203) Crowsnest Front to each (202) Upright Crowsnest using 2 (WB9) 5/16 x 2-1/8”...
  • Page 57 Step 20: Upper Crowsnest Assembly Part 2 D: Attach 1 (204) Crowsnest Short flush to the top of (201) Crowsnest Top using 6 (S11) #8 x 2” Wood Screws as shown in fig. 20.2. E: Attach 1 (205) Crowsnest Spacer flush to the outside of each (202) Upright Crowsnest using 3 (S11) #8 x 2” Wood Screws per board as shown in fig.
  • Page 58 Step 21: Crowsnest Assembly Part 1 A: Attach 1 (211) Crowsnest Bottom Side flush to the inside edge of the panel posts on (022) Slide End Panel and tight to the top of the floor support on (022) Slide End Panel using 3 (S11) #8 x 2” Wood Screws per side.
  • Page 59 Step 21: Crowsnest Assembly Part 2 B: Place the Lower Crowsnest Assembly from Step 19 centred in the opening of (022) Slide End Panel, in between (211) Crowsnest Bottom Sides, tight to the top of the floor boards then attach with 2 (S11) #8 x 2” Wood Screws per side.
  • Page 60 Step 21: Crowsnest Assembly Part 3 C: Attach 1 (212) Short Crowsnest Joist tight to (193) Crowsnest Back and flush to the bottom of each (211) Crowsnest Bottom Side using 3 (S20) #8 x 1-3/8” Wood Screws per board as shown in fig. 21.5. Screws to be installed from outside the assembly.
  • Page 61 Step 21: Crowsnest Assembly Part 4 E: Place Upper Crowsnest Assembly from Step 20 in between (211) Crowsnest Bottom Sides so (203) Crowsnest Front is flush to the bottom and front of each (211) Crowsnest Bottom Side and to the tops of (191) Crowsnest Gussets and (191) Crowsnest Joists.
  • Page 62 Step 21: Crowsnest Assembly Part 5 F: Attach (203) Crowsnest Front flush to the top of each (191) Crowsnest Gusset and each (192) Crowsnest Joist with 8 (S4) #8 x 3” Wood Screws. (fig. 21.8) G: Place 1 (213) Crowsnest Side flush to the top and front of (201) Crowsnest Top make sure each board is level then attach with 2 (S3) #8 x 2-1/2”...
  • Page 63 Step 21: Crowsnest Assembly Part 6 H: From inside the assembly attach (022) Slide End Panel to each (191) Crowsnest Gusset with 2 (S4) #8 x 3” Wood Screws per gusset. (fig. 21.9 and 21.10) I: Double check that each (213) Crowsnest Side is level then attach to (022) Slide End Panel flush to the inside of the panel post with 2 (S3) #8 x 2-1/2”...
  • Page 64 Step 22: Crowsnest Floor Assembly A: Lay down (221) Crowsnest Gap Board flush to front of (203) Crowsnest Front and (222) Crowsnest Floor flush to back of (193) Crowsnest Back. In between the gap and floor boards place another (222) Crowsnest Floor.
  • Page 65 Step 23: Crowsnest Wall Assembly A: Tight to each (202) Upright Crowsnest and tight to the floor and gap boards attach 1 (231) Cedar Wall to each (211) Crowsnest Bottom Side and (213) Crowsnest Side with 4 (S1) #8 x 1-1/8” Wood Screws per board. (fig. 23.1) B: Measure 2-1/4”...
  • Page 66 Step 24: Slide Section Assemblies Part 1 Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round recess and the lock nuts go through the side with the hexagonal recess. (fig. 24.3) A: Fit 2 TNR2 Slide Elbows together and attach with 8 (PB1) 1/4 x 3/4”...
  • Page 67 Step 24: Slide Section Assemblies Part 2 Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round recess and the lock nuts go through the side with the hexagonal recess. (fig. 24.3) D: Attach TNR2 Slide Exit Top and the remaining TNR2 Slide Elbow together using 8 (PB1) 1/4 x 3/4”...
  • Page 68 Step 25: Attach Flange Assembly to Fort A: With a helper place the Flange Assembly flush to the Crowsnest on the fort as shown in fig. 25.1 and 25.5, then pre-drill 1/8” pilot holes in the bottom 4 mounting locations on (221) Crowsnest Gap Board (approximate spots where circles are on figure), making sure the pre-drilled holes are a minimum of 1”...
  • Page 69 Step 26: Attach Elbow Assembly to Flange Assembly Note: Keep all bolts loose until further step. A: Fit one of the Elbow Assemblies to the Flange Assembly by lining up the arrows on each assembly. Attach Elbow Assembly to Flange Assembly using 6 (PB1) ¼ x 3/4” Pan Bolts and Square Lock Nut. (fig. 26.1, 26.2 and 26.3) B: Attach one of the Elbow assemblies to another Elbow Assembly making sure to line up the arrows on each assembly.
  • Page 70 Step 27: Attach TNR 3 Slide Exit to Elbow Assembly A: Insert flange of Exit Elbow Assembly (slide elbow) into the slots on TNR3 Short Exit. (fig. 27.1) B: Rotate Slide Exit and use Quadrex Driver as a guide pin so the holes are aligned and attach with 5 (PB1) 1/4 x 3/4”...
  • Page 71 Step 28: Attach Exit End Assembly to Fort A: Fit the Exit End Assembly to the last Elbow Assembly by lining up the arrows on each assembly. Notice the elbow orientation. (fig. 28.1). Attach with 6 (PB7) ¼ x 12.7mm Pan Bolts and Square Lock Nuts. (fig. 28.2) Fig.
  • Page 72 Step 29: Attach TNR 4 Clamp Rings A: Place 2 TNR4 Clamp Rings arounds each joint making sure to match the arrows with the end of the Clamp Ring as shown in (fig. 29.1 & 29.2 ). B: Connect TNR4 Clamp Rings in 2 spots using 1 (PB6) ¼ x 1” Pan Bolt (with lock nut) per side. (fig. 29.3) Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round recess and the lock nuts go through the side with the hexagonal recess.
  • Page 73 Step 30: Attach TNR 3 Slide to Fort A: On the fourth attached Elbow Assembly remove the pan bolt and nut which is facing the fort (installed in Step 24). (fig. 30.1) The bolt will no longer be needed, but keep the lock nut. B: Loosely attach TNR3 Tube Support (at the slightly bent end) to the slide seam using 1 (PB6) 1/4 x 1”...
  • Page 74 Step 31: TNR Brace Assembly A: Attach (311) TNR Upright to (312) TNR Ground Brace with 1 (H8) 1/4 x 4-1/4” Hex Bolt (with lock washer, flat washer and t-nut) in the top hole. Make sure both boards are square then attach with 1 (S11) #8 x 2”...
  • Page 75 Step 32: Attach Elbow Assemblies and TNR4 Slide A: Place TNR Brace centered over pilot holes of (312) AL/RW Ground Brace. Attach with 3 (S4) #8 x 3 Wood Screws. (fig. 32.3) B: Place 1 TNR4 Post Mount Clamp on either side of the Clamp Ring so that the bent tops clip in behind the Clamp Ring. (fig.
  • Page 76 Step 33: Attach Ground Stake to TNR Upright A: In the spot shown in fig. 33.1 drive 1 Rebar Ground Stake 13” into the ground against the (312) TNR Ground Brace. Be careful not to hit the washer while hammering stake into the ground as this could cause the washer to break off.
  • Page 77 Step 34: Monkey Rail Assembly Part 1 Pre-drill all pilot holes using a 1/8” drill bit before installing Wood Screws. A: Insert 5 (341) Dowels into both (342) Tunnel MK Rail Right and (343) Tunnel MK Rail Left. (Fig. 34.1and 34.2) B: Make sure shoulder of dowel is against each rail before predrilling pilot holes.
  • Page 78 Step 34: Monkey Rail Assembly Part 2 E: Making sure that it’s flush with the end and sides of (343) Tunnel MK Rail Left, place 1 (344) Floor Board End B as shown in (fig. 34.7). and attach using 2 (S20) #8 x 1-3/8” Wood Screws. F: Place (345) Floor Board End A next to (344) Floor Board End B, making sure that the notched out area is flush with the end of (342) Tunnel MK Rail Right.
  • Page 79 Step 35: Monkey Ladder Assembly Part 1 Pre-drill all pilot holes using a 1/8” (3.2 mm) drill bit before installing Wood Screws. A: Insert 4 (341) Dowels into (351) Tunnel Ladder Rail Right and (352) Tunnel Ladder Rail Left. Make sure shoulder of dowel is against each rail before pre-drilling pilot holes.
  • Page 80 Step 35: Monkey Ladder Assembly Part 2 C: At bottom of (351) Tunnel Ladder Rail Right and (352) Tunnel Ladder Rail Left attach (353) Tunnel Ground with 2 (H5) Hex Bolts (with lock washer, flat washer and t-nut). Be sure to keep the bolts loose. (Fig. 35.3) D: Make sure the assembly is square and then attach 1 (354) Tunnel Diagonal to each end of (353) Tunnel Ground with 1 (H3) Hex Bolt (with lock washer, flat washer and t-nut) per diagonal (Fig.) and to each (351) Tunnel Ladder Rail Right and (352) Tunnel Ladder Rail Left with 1 (H12) Hex Bolt (with lock washer, flat washer and...
  • Page 81 Step 36: Attach Monkey Ladder and Rail Assemblies A: Using 2 (G22) Hex Bolts (with lock washer, flat washer and t-nut) connect (371) Access Upright to assembled Monkey Ladder. Keep bolts loose. (Fig. 36.1 and 36.2) B: Using 4 (H11) Hex Bolts (with lock washer, flat washer and t-nut) connect (371) Access Upright to assembled Monkey Ladder and Tunnel Floor.
  • Page 82 Step 37: Attach Monkey Ladder and Rail Assemblies A: Measure 4-1/2” inches down from the top of the tunnel opening and install (361) Tunnel Support to (021) Narrow Back Panel using 9 (S11) #8 x 2” Wood Screws.It is important to make sure the (361) Tunnel Support is flush to the right side of the panel.(fig.
  • Page 83 Step 38: Join Swing and Slide Wall Assemblies A: With a helper place Tunnel so it is resting on the (361) Tunnel Support as shown in (fig. 38.1) B: Attach from above using 3 (S20) #8 x1-3/8” Wood Screws. (fig. 38.2 & 38.4) C: From the underside of the tunnel place 1 bracket to the inside of the (342) Tunnel MK Right Rail and the Main Clubhouse to connect them.
  • Page 84 Step 39: Assemble Tunnel Entrance & Safety Rail Part 1 Pre-drill all pilot holes using a 1/8” (3.2 mm) drill bit before installing Wood Screws. A: Attach (391) Tunnel Top to (392) Tunnel Post with 2 (H13) Hex Bolts (with lock washer, flat washer and t-nut) and 2 (S4) Wood Screws.
  • Page 85 Step 39: Assemble Tunnel Entrance & Safety Rail Part 2 D: On the inside right of the entrance assembly attach 1 (395) Short Tunnel Rail to the (392) Tunnel Post using 2 (H11) ¼ x 2-3/4” Hex Bolts (with flat washer, lock washer and t-nut). Note board orientation. (fig. 39.4 & 39.5) E: On the inside left of the entrance assembly attach 1 (396) Tunnel Rail to the (392) Tunnel Post using 2 (H11) ¼...
  • Page 86 Step 40: Attach Tunnel A: Place entrance assembly against the fort as shown in (fig. 40.1) making sure that the (392) Tunnel Posts are flush to the bottoms of the (342 and 343) Tunnel MK Rails. (fig. 40.1) B: Attach the (392) Tunnel Posts to each Tunnel MK Rail using 1 (H11) ¼ x2-3/4” Hex Bolts (with flat washer, lock washer and t-nut) per side.
  • Page 87 Step 41: Attach Pickets A: From the inside edge of the left (392) Tunnel Post measure 2-1/2” in towards the fort. Place 1 (411) Picket so it is horizontal to the (343) Tunnel MK Rail Left and (396) Tunnel Rail. Attach using 2 (S3) #8 x 2-1/2” Wood Screws, making sure that Picket is flush at the top and bottom.
  • Page 88 Step 42: Build Tunnel Assembly Part 1 A: Bend all 6 MOD Tunnel Panels as shown in fig. 42.1 B: Match 2 MOD Tunnel Panels together by making a slight “V” with the pieces so the peak of the “V” faces away from you.
  • Page 89 Step 42: Build Tunnel Assembly Part 2 E: Attach the tops of each Tunnel Side together using 2 (MB1) Pan Bolts (with #12 Lock Nut) per side. (Fig. 42.4 and 42.5) F: Join the 2 Tunnel Sides together so the tops are tight together and attach with 12 (MB1) Pan Bolts (with #12 Lock Nut).
  • Page 90 Step 43: Attach Tunnel Assembly to Entrance A: With 2 helpers, from inside the fort attach the tunnel with 9 (S10) Pan Screws making sure the Tunnel measures 3-1/4” from the bottom of the Tunnel MK rail. (Fig. 43.1 and Fig. 43.2) B: Attach tunnel to Tunnel MK Rails with 18 (S10) Pan Screws maintaining 3-1/4”...
  • Page 91 Step 44: Attach Tunnel Entrance A: Attach Entrance Assemblyt to Tunnel MK Rails using 2 (H11) Hex Bolts (with lock washer, flat washer and t-nut). Keep bolts loose. (Fig. 44.1 and 44.2) Fig. 44.1 1/4” T-Nut Floor Board 1/4” Flat hidden for clarity Washer 1/4”...
  • Page 92 Step 45: Attach Safety Rail Assembly A: Loosen all bolts installed in Step 39. (Fig. 39.1, 39.2 and 39.3) B: Attach (394) Safety Rail to (392) Tunnel Post, (371) Access Upright and (352 and 351) Tunnel Ladder Rails with 5 (H11) Hex Bolts (with lock washer, flat washer and t-nut) to both sides of Adventure Tunnel. Keep bolts loose.
  • Page 93 Step 46: Secure Tunnel to Entrance A: Make sure Tunnel is tight to Tunnel Entrance. From the inside attach Tunnel to (392) Tunnel Post using 8 (S10) Pan Screws. (Fig. 46.1) B: Attach Tunnel to (393) Tunnel Arch using 4 (S10) Pan Screws. (Fig. 46.2) C: Tighten bolts from Step 43 and 45.
  • Page 94 Step 47: Attach Pickets and Hand Rails A: Attach (411) Picket to (394) Safety Rail and Tunnel MK Rail centred in space using 2 (S3) Wood Screws per Picket. (Fig. 47.1) B: Measure 11” down on the Tunnel Rails and attach 1 Steel Hand Grip to (351) Tunnel Ladder Rail Right and (352) Tunnel Ladder Rail Left using 2 (WL3) ¼...
  • Page 95 Step 48: Attach Ground Stakes A: In the 2 places shown in fig. 48.1 drive the Rebar Ground Stakes 13” into the ground. Be careful not to hit the washer while hammering stakes into the ground as this could cause the washer to break off. B: Attach Ground Stakes using 1 (S7) Pan Screw per Ground Stake (Fig.
  • Page 96 Step 49: Attach Flags A: Insert 1 Flag into slots on 1 Flag Pole to complete 1 Deluxe Flying Flag as shown in fig. 49.1. Create 2 Deluxe Flying Flags. B: Place 1 Deluxe Flying Flag on either side of the (391) Tunnel Top and attach with 2 (S0) #8 x 7/8” Truss Screws per flag as shown in fig.
  • Page 97 Step 50: Roof Support Assemblies A: Attach 1 (501) Roof Support to a second (501) Roof Support at peak using 1 (S4) #8 x 3” Wood Screw. Repeat this twice so there are 2 Roof Support Assemblies. (fig. 50.1) B: Attach 1 (502) Roof Support Small to a second (502) Roof Support Small at peak using 1 (S4) #8 x 3” Wood Screw.
  • Page 98 Step 51: Large Roof Assembly Part 1 A: Place (511) Front Roof Panel against (512) Back Roof Panel so the tops form a peak then tight to the inside edge of the outside slats attach 1 Narrow Angle Bracket per slat with 2 (S0) #8 x 7/8” Truss Screws per bracket. (fig.
  • Page 99 Step 51: Large Roof Assembly Part 2 C: Place 1 (501) Roof Support Assembly against one side so the peaks meet and the ends of the roof supports are flush with the ends of the roof panels. Attach with 8 (S11) #8 x 2” Wood Screws. (fig. 51.4) D: Attach the second (501) Roof Support Assembly on the opposite side, peaks to meet and ends are flush with 8 (S11) #8 x 2”...
  • Page 100 Step 52: Attach MOD 3 Pane Gable A: On each side of the Large Roof Assembly attach 2 MOD 3 Pane Gables to the inside of the (501) Roof Supports with 4 (S0) #8 x 7/8” Truss Screws per gable. (fig. 52.1 and 52.2) MOD 3 Pane Gable Fig.52.1 Large Roof...
  • Page 101 Step 53: Gable Dormer Assembly A: Place (531) Gable Dormer RT tight to (532) Gable Dormer LT then place MOD 3 Pane Gable tight against the dormers and attach with 4 (S0) #8 x 7/8” Truss Screws. (fig. 53.1) B: Attach (531) Gable Dormer RT and (532) Gable Dormer LT with 1 Narrow Angle Bracket using 2 (S0) #8 x 7/8”...
  • Page 102 Step 54: Attach Gable Dormer to Large Roof A: On the outside of the Large Roof Assembly on (511) Front Roof Panel, on the 4th siding down, place (541) Dormer Cleat centred on the panel (over the middle inside slat) then attach with 2 (S11) #8 x 2” Wood Screws. Make sure the screws go into the siding and the slats.
  • Page 103 Step 55: Small Roof Assembly Part 1 A: Attach 1 (551) Mid Roof Support to a second (551) Mid Roof Support at peak using 1 (S4) #8 x 3” Wood Screw. Notice pilot holes are at the bottom of the boards. (fig. 55.1) Fig.55.1 Notice pilot holes at bottom of board...
  • Page 104 Step 55: Small Roof Assembly Part 2 B: Place (552) Front Small Roof against (553) Back Small Roof so the tops form a peak then tight to the inside edge of the outside slats attach 1 Narrow Angle Bracket per slat with 2 (S0) #8 x 7/8” Truss Screws per bracket. (fig.
  • Page 105 Step 55: Small Roof Assembly Part 3 D: Place Small Roof Support Assembly against opposite side of the Small Roof Assembly so the peaks meet and the ends of the roof supports are flush with the ends of the roof panels. Attach with 6 (S11) #8 x 2” Wood Screws.
  • Page 106 Step 56: Transom Assembly Part 1 A: With the notches facing down tap 3 1/4” T-nuts into (561) TB Support then fit (562) Right Upright, (563) Left Upright and (564) Centre Upright into the grooves so the ends and tops are flush. Attach with 3 (H9) 1/4 x 1-1/4” Hex Bolts (with lock washer and flat washer).
  • Page 107 Step 56: Transom Assembly Part 2 B: Place 2 MOD 5 Pane Windows in the openings and attach to (562) Right Upright, (563) Left Upright and (564) Centre Upright with 4 (S0) #8 x 7/8” Truss Screws per window. (fig. 56.2) C: Attach (565) Wall Tie flush to the top of (561) TB Support and to (564) Centre Upright with 4 (S11) #8 x 2”...
  • Page 108 Step 57: Swing Top Assembly A: Attach (571) Swing Top to 2 (572) Swing Side Uprights with 2 (H3) 1/4 x 2-1/2” Hex Bolts (with lock washer, flat washer and t-nut). (fig. 57.1) Fig. 57.1 1/4” Lock Washer 1/4” Flat Washer 1/4”...
  • Page 109 Step 58: Attach Wall Supports A: Tight to the floor boards and tight in each corner of the (032) SW Wall Panel attach 2 (581) Wall Supports to (032) SW Wall Panel with 3 (S3) #8 x 2-1/2” Wood Screws per support. Making sure to note hole orientation. (fig. 58.1) Fig.
  • Page 110 Step 59: Attach Swing Top Assembly A: Tight to the top of (032) SW Wall Panel and flush to the outside of each (581) Wall Support place Swing Top Assembly then attach (581) Wall Supports to (572) Swing Side Uprights with 2 (S3) #8 x 2-1/2” Wood Screws per support.
  • Page 111 Step 60: Attach Transom Assembly Part 1 A: Place 1 Transom Assembly on both (031) Front Wall Panel and (033) Back Wall Panel so they are tight to (571) Swing Top and (581) Wall Supports. From the outside attach each Transom Assembly to (581) Wall Supports with 2 (S3) #8 x 2-1/2”...
  • Page 112 Step 60: Attach Transom Assembly Part 2 D: Attach the top of each MOD 5 Pane Window to each (561) TB Support with 1 (S0) #8 x 7/8” Truss Screw per window then attach bottom of windows to (031) Front Wall Panel and (033) Back Wall Panel with 2 (S0) #8 x 7/8” Truss Screws per window.
  • Page 113 Step 61: Attach Mid Roof Ends A: Flush to the tops of (021) Narrow Back Panel and (023) Narrow Front Panel and flush to the outside edge of each Transom Assembly attach 1 (611) Mid Roof End per panel with 1 (S11) #8 x 2” Wood Screw in the bottom hole and 1 (S3) #8 x 2-1/2”...
  • Page 114 Step 62: Attach Roof End Shorts A: On (022) Slide End Panel place 1 (621) Roof End Short at each end flush to the top of the panel and each overhanging by 1-7/8” then attach with 2 (S11) #8 x 2” Wood Screws into the panel and 1 (S3) #8 x 2-1/2” Wood Screw into the front and back panels.
  • Page 115 Step 63: Attach Small Roof Assembly Part 1 A: With 2 people on the ground and at least 1 person in the fort, lift Small Roof Assembly up and over the Back side of the fort. Guide the Small Roof Assembly onto the fort so the ends of the Small Roof Support Assembly sit flush to the front and ends of each (621) Roof End Short.
  • Page 116 Step 63: Attach Small Roof Assembly Part 2 C: Attach Mid Roof Support Assembly to Transom Assemblies with 2 (S3) #8 x 2-1/2” Wood Screws. (fig. 63.3) Transom Fig. 63.3 Assembly Mid Roof Support Assembly Transom Assembly Hardware #8 x 2-1/2” Wood Screw...
  • Page 117 Step 64: Attach Long Roof Ends A: Place 1 (641) Long Roof End tight to each (551) Mid Roof Support and flush to the top of the Transom Assembly. Make sure (641) Long Roof End is level and the overhang at each end measures 4-1/4”, then attach to (551) Mid Roof Supports with 1 (S3) #8 x 2-1/2”...
  • Page 118 Step 65: Attach Transom Boards A: Tight to 1 Transom Assembly and flush to the bottom of (551) Mid Roof Support attach 1 (651) Transom Board A to (551) Mid Roof Support and (641) Long Roof End with 4 (S20) #8 x 1-3/8” Wood Screws. (fig. 65.1 and 65.2) B: Tight to (651) Transom Board A and flush to the bottom of (551) Mid Roof Support attach 1 (652) Transom Board B to (551) Mid Roof Support and (641) Long Roof End with 4 (S20) #8 x 1-3/8”...
  • Page 119 Step 66: Attach Large Roof Assembly A: With 2 people on the ground and at least 1 person in the fort, lift the Large Roof Assembly up and over the Back side of the fort. Guide the Roof Assembly onto the fort so all four (501) Roof Supports sit flush to the front and outside edges of (571) Swing Top and each (641) Long Roof End.
  • Page 120 Step 67: Attach Swings A: Using 1 Threaded Quick Link per chain, join 1 Long Swing Chain to each side of the Swing Belt Seat. Make sure to close the Threaded Quick Link tightly using an adjustable wrench. (fig. 67.1 and 67.2). B: Using 1 Threaded Clip per chain, join the Short Swing Chain to the Acro Bar and Acro Handle.
  • Page 121 Step 68: Attach Slides Note: Pre-drill all holes using a 1/8” drill bit before installing the pan screws. A: Place Slide centred in the opening of the (031) Front Wall Panel. Slide must be tight to the outside of (031) Front Wall Panel.
  • Page 122 Step 69: Assemble and Attach BBQ Kitchen Part 1 A: On (031) Front Wall place BBQ Base on (064) Table Top. Use BBQ Cooktop as a guide so there is enough room for BBQ Cooktop and 1” gap to the edge of the wall to the left of BBQ Base. Attach BBQ Base to (064) Table Top with 4 (S0) #8 x 7/8”...
  • Page 123 Step 69: Assemble and Attach BBQ Kitchen Part 2 C: Slide BBQ Cooktop tight beside BBQ Base on the left and BBQ Sink Set tight on the right. Attach both BBQ Cooktop and BBQ Sink Set to (064) Tabel Top with 2 (S0) #8 x 7/8” Truss Screws each. (fig. 69.5, 69.6, 69.7 and 69.8) D: Place Faucet and 2 Sink Knobs in opening of Sink and attach Sink Knobs with included hardware.
  • Page 124 Step 70: Attach Utensil Shelves Part 1 A: From outside the assembly in the top of the opening of (031) Front Wall Panel, 1” in from the panel, attach 1 Utensil Shelf with 2 (S0) #8 x 7/8” Truss Screws as shown in fig. 70.1, 70.2 and 70.3. B: Attach Sign to the Utensil Shelf.
  • Page 125 Step 70: Attach Utensil Shelves Part 2 C: From outside the assembly, centred below the BBQ Kitchen attach 1 Utensil Shelf to (063) Table Support with 2 (S0) #8 x 7/8” Truss Screws as shown in fig. 70.4 and 70.5. D: Attach Pan, Tongs and Spatula to the Utensil Shelf.
  • Page 126 Step 71: Attach Telescope A: On the top, centre of the (032) SW Wall Panel, attach Telescope with 2 (S20) #8 x 1-3/8” Wood Screws. (fig. 71.1 & 71.2) Fig. 71.1 Fig. 71.2 Telescope Hardware Other Parts #8 x 1-3/8” Wood Screw 1 x Telescope...
  • Page 127 Maximum number of users, Installation & Operating Instructions; other information is available at: www.KidKraft.com Contact us at: KidKraft Dallas, TX 75244 USA 1-800-933-0771 Tracking Number: Other Parts Hardware #7 x 5/8” Pan Screw 1 x I.D. Plaque - KidKraft...
  • Page 128 NOTES...
  • Page 129 Would you recommend the purchase of our products to friends and family? Comments: MAIL TO: Fill out your registration card online at KidKraft www.cedarsummitplay.com/ 4630 Olin Road registration Dallas, TX 75244 United States Cedar Summit by KidKraft would like to say Attention: Customer Service Thank You for your time and feedback.