Download Print this page

Advertisement

Quick Links

LOOKOUT
EXTREME
PLAYSET
F25745E
INSTALLATION AND OPERATING INSTRUCTIONS
F25745 Lookout Extreme
Safety Zone
32' 4"
989cm
9.89 m
19' 4"
589cm
5.89 m
10 - 12 Hrs
10 - 12 Hrs
2-4 Hrs
1 - 2 Hrs
FOR FORT & SWING
FOR FORT & SWING
TUBE SLIDE
TWO PERSON
ASSEMBLY
For Outdoor Family Domestic Use Only
WARNING
Manufacturer contact information provided below.
OBSTACLE FREE SAFETY ZONE - 32' 4" x 27'11" (9.89 x 8.5 m) area requires Protective Surfacing. See page 3.
MAXIMUM VERTICAL FALL HEIGHT - 6' 7" (2.01 m)
27' 11"
850cm
12' 8"
8.5 m
386cm
3.86 m
CAPACITY - 16 Users Maximum, Ages 3 to 10; Weight Limit 110 lbs. (49.9 kg) per child.
RESIDENTIAL HOME USE ONLY. Not intended for public areas such as multi-unit residences, schools, churches,
nurseries, day cares or parks.
Warning. Only for domestic use.
Cedar Summit by KidKraft
4630 Olin Road
Dallas, TX 75244, United States
customersupport@kidkraft . c om
Online Parts Replacement:
Cedarsummitplay . c om/parts-center-warranty-claim
Customer Service:
1(800) 933-0771 or (972) 385-0100
KidKraft Netherlands BV
Olympisch Stadion 29
1076DE Amsterdam, The Netherlands
Europe Customer Service: +31 (0)20 305 8620
europecustomerservice@kidkraft . c om
EU Online Parts Replacement: parts . k idkraft . e u
To reduce the risk of serious injury or death, you must read and
follow these instructions. Keep and refer to these instructions
often and give them to any future owner of this play set.

Table of Contents

Warnings and Safe Play Instructions . . . . . . . . . . pg . 2
Protective Surfacing Guidelines . . . . . . . . . . . . . . . pg . 3
Instructions for Proper Maintenance . . . . . . . . . pg . 4
About Our Wood - Limited Warranty . . . . . . . . . pg . 5
Keys to Assembly Success . . . . . . . . . . . . . . . . . . . . pg . 6
Part ID . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .pg . 10
Step-By-Step Instructions . . . . . . . . . . . . . . . . . . .pg . 19
Installation of I . D . / Warning Plaque . . . . . .Final Step
9405745E
14 - 18 Hrs
FOR FORT & SWING
TWO PERSON
ASSEMBLY
Rev 04/25/2019

Advertisement

loading

Summary of Contents for KidKraft Cedar Summit F25745E

  • Page 1: Table Of Contents

    For Outdoor Family Domestic Use Only Table of Contents Cedar Summit by KidKraft 4630 Olin Road Warnings and Safe Play Instructions . . . . . . . . . . pg . 2 Dallas, TX 75244, United States Protective Surfacing Guidelines .
  • Page 2: Warnings And Safe Play Instructions

    Cool hot slide and rides with water and wipe o l l l i h i l s r fi dry prior to using. run up slide. Orientate slide such that it gets the least amount of exposure to the sun. europecustomerservice@kidkraft.com...
  • Page 3: Protective Surfacing Guidelines

    Denotes Use Zone with Protective Surfacing 6 ft. 6 ft. Denotes Use Zone with Protective Surfacing 6 ft. 6 ft. 6 ft. Use Zone for Single-Axis Swings Use Zone for Multi-Axis Swings From the CPSC Outdoor Home Playground Safety Handbook. At http://www.playgroundregs.com/resources/CPSC%20324.pdf europecustomerservice@kidkraft.com...
  • Page 4: Instructions For Proper Maintenance

    (See Protective Surfacing, page 3) If you dispose of your play set: Please disassemble and dispose of your unit so that it does not create any unreasonable hazards at the time it is discarded. Be sure to follow your local waste ordinances. europecustomerservice@kidkraft.com...
  • Page 5: About Our Wood - Limited Warranty

    Such use may lead to product failure and potential injury. Any and all public use will void this warranty. Cedar Summit by KidKraft disclaims all other representations and warranties of any kind, express or implied province to province. This warranty excludes all consequential damages, however, some states do not allow the limitation or exclusion of consequential damages, and therefore this limitation may not apply to you.
  • Page 6: Keys To Assembly Success

    5/16” is slightly Washer larger than 1/4”. Note: Wafer head bolts with blue lock Flat tight or a bolt with a Ny-Lok nut do T-Nut Washer NOT require a lock washer. (Hammer into place) Do not crush wood! europecustomerservice@kidkraft.com...
  • Page 7 HARDWARE: The majority of each hardware part comes packed in a separate bag so you do not need to sort the hardware. Each assembly step indicates which hardware (bolt, screw, washer etc.) you will require to complete the step. europecustomerservice@kidkraft.com...
  • Page 8 europecustomerservice@kidkraft.com...
  • Page 9 europecustomerservice@kidkraft.com...
  • Page 10: Part Id

    1pc. - 573 - 15.9 x 108 x 1447.8mm - Rock Wall D FSC - Box 2 - 4819249 5/8 x 4-1/4 x 57" 1pc. - 574 - 15.9 x 108 x 1447.8mm - Rock Wall E FSC - Box 2 - 4819250 5/8 x 4-1/4 x 57" europecustomerservice@kidkraft.com...
  • Page 11 1pc. - 584 - 23.8 x 76.2 x 520mm - Barrier Top E FSC - Box 2 - 4819210 15/16 x 3 x 20-15/32" 1pc. - 585 - 23.8 x 76.2 x 526.4mm - Barrier Top A FSC - Box 2 - 4819206 15/16 x 3 x 20-23/32" europecustomerservice@kidkraft.com...
  • Page 12 1pc. - 062 - 31.8 x 57.2 x1340.3mm - Narrow Wall D FSC - Box 2 - 4819217 1-1/4 x 2-1/4 x 52-49/64" 1pc. - 052 - 31.8 x 57.2 x 1340.3mm - Rock Wall I FSC - Box 2 - 4819254 1-1/4 x 2-1/4 x 52-49/64" europecustomerservice@kidkraft.com...
  • Page 13 2pc. - 272 - 31.8 x 76.2 x 419.1mm - Right Upright FSC - Box 3 - 4819110 1-1/4 x 3 x 16-1/2" 1pc. - 761 - 31.8 x 76.2 x 514.4mm - TNR Upright FSC - Box 2 - 4818965 1-1/4 x 3 x 20-1/4" europecustomerservice@kidkraft.com...
  • Page 14 1pc. - 431 - 31.8 x 102.2 x 617.5 - SL Bottom B FSC - Box 3 - 4819289 1-1/4 x 4 x 24-5/16" 2pc. - 273 - 31.8 x 108 x 419.1mm - Left Upright FSC - Box 3 - 4819107 1-1/4 x 4-1/4 x 16-1/2" europecustomerservice@kidkraft.com...
  • Page 15 2pc. - 213 - 76.2 x 76.2 x 2336.8mm - SW Post FSC - Box 1 - 4819070 3 x 3 x 92" 1pc. - 201 - 76.2 x 133.4 x 2336.8 - Engineered SW Beam FSC - Box 1 - 4819049 3 x 5-1/4 x 92" europecustomerservice@kidkraft.com...
  • Page 16 Nest End Panel FSC - Box 3 - 47819197 1-1/4 x 37 x 92" 1-1/4 x 37 x 92" 1pc. - 072 - 31.8 x 546.1 x 2336.8mm Back Panel Narrow FSC - Box 2 - 47819193 1-1/4 x 21-1/2 x 92" europecustomerservice@kidkraft.com...
  • Page 17 1x - TNR 2 Slide Exit Top 1x - TNR3 Short Exit (3310224) (3310232) 1x - TNR 3 Extended Flange Lt (3310230) 10x - TNR 4 Clamp Ring (9300230) (Yellow) 10pcs number 3300230 9x - TNR 2 Slide Elbow (3310221) europecustomerservice@kidkraft.com...
  • Page 18 #8 x 2-1/2" (99) S3 - Wood Screw - (52043522) #12 x 2" (31) S7 - Pan Screw - (52433620) #8 x 3" (28) S4 - Wood Screw - (52043530) #8 x 1 3/4" 1pc. - -Flat Head Screw - (52042513) europecustomerservice@kidkraft.com...
  • Page 19 Hex Bolt 1/4 x 1-1/4" (6) H9 - (53703211) Hex Bolt 3/8 x 4" (1) G20 - - (53703840) Hex Bolt 3/8 x 6" (4) G17 - - (53703860) Hex Bolt 3/8 x 9-1/4" (1) G26 - - (53703891) europecustomerservice@kidkraft.com...
  • Page 20 Part Identification (Reduced Part Size) 1x - Cedar 1x - Rocks (10pk) (3320012) Summit/KidKraft 31x - Square Nylok Nut Plaque 2x - TNR 4 Post Mount (54902200) (9320358) Clamp (9203657) 1x - TNR 4 Post Mount Base 1x - Telescope w/ Mount (9203656) 1x - 1/4 x 14.5mm Pan...
  • Page 21 Europe Customer Service: +31 (0)20 305 8620 Online Parts Replacement: europecustomerservice@kidkraft.com Cedarsummitplay.com/parts-center- EU Online Parts Replacement: parts.kidkraft.eu warranty-claim Customer Service: 1(800) 933-0771 or (972) 385-0100 Read the assembly manual completely, paying special attention to EN71 and ASTM warnings; notes; and safety/maintenance information on pages 1 - 6.
  • Page 22 Step 2: Access Ladder/Rope Wall Assembly Part 1 A: Place (021) Left Access on one side of 4 (023) Treads and (022) Right Access on the other side with the grooves facing in. (fig. 2.1) B: Fit each (023) Tread into grooves on both (021) and (022) Access rails, making sure the top edge of the (023) Treads are flush to the front of the Access rails.
  • Page 23 Step 2: Access Ladder/Rope Wall Assembly Part 2 D: Making sure that the pre-sunk holes are facing the outside, place (024) Rope Rail on the ground next to (022) Right Access so it matches the orientation of the two access rails as shown in fig. 2.5. Attach (025) RW-AL Support flush to the top of Access Ladder assembly and (024) Rope Rail using 3 (S20) #8 x 1-3/8”...
  • Page 24 Step 3: Nest Ladder Assembly A: Place (031) Nest Left Access on one side of 3 (033) Nest Treads and (032) Nest Right Access on the other side with the grooves facing in. (fig. 2.1) B: Fit each (033) Nest Tread into grooves on both (031) and (032) Access rails, making sure the top edge of the Nest Access Ladder (033) Nest Treads are flush to the front of the Access rails.
  • Page 25 Step 4: Nest Joist Assembly A: Place (041) Nest Mid Joist between (042) Front Wall Tie and (043) Back Wall Tie as shown in fig. 4.1 making sure to closely follow the hole orientation. Attach using 4 (S3) #8 x 2-1/2” Wood Screws. (Fig. 4.1) B: Using the next set of pre-drilled holes on the (043) Back Wall Tie attach the (044) Nest Side Joist using 2 (S3) #8 x 2-1/2”...
  • Page 26 Step 5: Large Rock Wall Frame Assembly Part 1 It is important to note the beveled edges on all horizontal boards. A: Place (051) Rock Wall H and (052) Rock Wall I together so that they are connected at the notched ends. Attach using 1 (H10) 1/4 x 2-1/4”...
  • Page 27 Step 5: Large Rock Wall Frame Assembly Part 2 E: Taking care to note hole orientation place (063) Rock Wall A as shown in fig.5.6 and attach to (053) Rock Support Back and (054) Rock Wall Floor Cross using 2 (WB2) 5/16 x 1-3/8” Wafer Head Bolt (with flat washer and t-nut) and 4 (S20) #8 x 1-3/8”...
  • Page 28 Step 6: Narrow Wall Frame Assembly A: Place (051) Rock Wall H and (062) Narrow Wall D together so that they are connected at the notched ends. Attach using 1 (H10) 1/4 x 2-1/4” Hex Bolt (with lock washer, flat washer and t-nut). (Fig. 6.1 and 6.2) B: Place (057) Narrow Wall A on the left side of the frame assembly so that the top ends of the boards line up, making sure to note hole orientation.
  • Page 29 Step 7: Slide Wall Assembly A: Place (072) Narrow Panel Back against the left side of (071) Nest End Panel noticing panel orientation. The tops and bottoms of the panels should be flush and panels square. Pre-drill with a 3/16” drill bit, then fasten (072) Narrow Panel Back to (071) Nest End Panel with 4 (WL5) 1/4 x 2-1/2”...
  • Page 30 Step 8: Swing Wall Assembly A: Place (082) Panel Front Wall against the left side of (081) SW Wall Panel noticing panel orientation. The tops and bottoms of the panels should be flush and panels square. Pre-drill with a 3/16” drill bit, then fasten (082) Panel Front Wall to (081) SW Wall Panel with 4 (WL5) 1/4 x 2-1/2”...
  • Page 31 Step 9: Join Swing and Slide Assemblies Part 1 A: With at least two helpers lift the Slide Wall Assembly and Swing Wall Assembly so the (072) Narrow Panel Back and (073) Narrow Front Panel meet with (083) Wall Panel Back and (082) Panel Front Wall and are tight together as shown in fig.
  • Page 32 Step 9: Join Swing and Slide Assemblies Part 2 Note: It is important to ensure that all t-nuts are installed in the correct locations. C: Open the Rope Ladder bag and locate the (M8) t-nut. From inside the fort install (M8) t-nut into the Back Wall using the second hole from the left as shown in fig.
  • Page 33 Step 10: Install Joist Assembly A: From inside the assembly measure 5/8” (15.9mm) down from the top of the Wall Panels and place the joist install loosely with bolts only, 5/8" down assembly so that the (042) Front Wall Tie and (043) Back Wall Tie are tight to Wall Panel as shown in fig.10.1. Loosely attach the assembly using 4 (H10) 1/4 x 2-1/4”...
  • Page 34 Step 11: Install Brackets A: On the inside of the assembly attach (072) Narrow Panel Back to (083) Wall Panel Back using 2 Flat Panel Brackets in the places shown with 4 (S8) #12 x 3/4” Pan Screws per bracket. (fig. 11.1 and 11.2) B: Repeat Step A to attach (073) Narrow Front Panel to (082) Front Wall Panel.
  • Page 35 Step 12: Floor Assembly Part 1 A: Place 1 (121) Floor Board tight to (071) Nest End Panel and place a second (121) Floor Board tight to (081) SW Wall Panel. Attach each Floor Board to the (092) Side Joists with 4 (S20) #8 x 1-3/8” Wood Screws per board. (fig.
  • Page 36 Step 12: Floor Assembly Part 2 C: Measure the distance from the Back Wall to the Front Wall from the inside of the panels to make sure it equals 35-3/4”. Maintain this measurement when installing the floor boards. Starting at the Slide Wall place 3 (121) Floor Boards tight to the previously attached (121) Floor Board, followed by 1 (123) Floor Board then 8 more (121) Floor Boards.
  • Page 37 Step 13: Attach Wall Tops A: In the opening of (081) SW Wall Panel, from the inside, place (131) SW Wall Top, tight to the corner of the panels with overhang facing in. Attach using 1 (S11) #8 x 2” Wood Screw at each end as shown in fig. 13.1 and 13.2.
  • Page 38 Step 14: Attach Diagonal A: Loosely attach (141) SW Ground to (142) Diagonal with 1 (WB9) 5/16 x 2-1/8” Wafer Bolt (with flat washer and t-nut) then place (142) Diagonal tight and flush to the front of (081) SW Wall Panel. The (141) SW Ground should be flush to the bottom of (081) SW Wall Panel.
  • Page 39 Step 15: Attach Access Ladder/Rope Wall Assembly Part 1 A: Place Access Ladder/Rockwall Assembly from Step 3 against (083) Wall Panel Back, flush to the outside edge and flush to the top of the floor boards then attach with 3 (WB9) 5/16 x 2-1/8” Wafer Bolt (with flat washer). (fig.
  • Page 40 Step 15: Attach Access Ladder/Rope Wall Assembly Part 2 B: Starting with the top of the rope ladder, insert the bolt through the hole in (025) RW-AL Support and tighten bolt to connect it to the (M8) t-nut (previously installed). Attach the sides of the rope ladder to each access rail and the bottom end into the (027) Rope Bottom using the flat washers and lock nuts provided.
  • Page 41 Step 15: Attach Access Ladder/Rope Wall Assembly Part 3 C: Place (151) Support Diagonal so that the angled end is flush to the front edge and to the bottom of (021) Left Access Rail. The opposite end should be tight against (083) Wall Panel Back. Attach (151) Support Diagonal to (021) Left Access Rail using 1 (H10) 1/4 x 2-1/4”...
  • Page 42 Step 16: Attach Steel Hand Grips and Handrail to Fort Part 1 A: On the (083) Back Wall Panel, measure 5-1/2” up from the (025) RW-AL Support in the 2 locations shown in fig. 16.1. Place the Steel Hand Grips in position and mark the hole locations on the panel. Pre-drill with a 1/8” drill bit making sure the holes are centered then attach each Steel Hand Grip using 2 (WL3) 1/4 x 1-3/8”...
  • Page 43 Step 16: Attach Steel Hand Grips and Handrail to Fort Part 2 A: On the inside edge of (083) Back Wall Panel, measure 2” up from the floor and place EN71 Hand Rail so it is flush to the edge as shown in fig. 16.4. The bottom of the Handrail should be centered on (021) Left Access. Pre- drill holes using a 3/16”...
  • Page 44 Step 17: Door Panel Assembly Part 1 A: On the inside of (171) Door Window Panel measure 15” up from the bottom and attach Catch Plate flush to the edge using 2 (S38) #7 x 1-1/8” Pan Screws. (fig. 17.1 and 17.2) B: On the inside of (171) Door Window Panel measure 22”...
  • Page 45 Step 17: Door Panel Assembly Part 2 C: On the outside of the (171) Door Window Panel attach the second Door Handle at approximately the same place as the one on the inside. Use 2 (S37) #7 x 5/8” Pan Screws. (fig. 17.3) D: Attach 2 Door Hinges on the outside of the (120) Door Window Panel on the opposite side from the Door Handle.
  • Page 46 Step 17: Door Panel Assembly Part 3 E: In the opening for the door, measure 3/4” from the top of (073) Narrow Front Panel bottom and maximum 5/8” from left side of the opening which would be the Door Hinge side and attach the remaining side of the hinges to (073) Narrow Front Panel using 3 (S37) #7 x 5/8”...
  • Page 47 Step 17: Door Panel Assembly Part 4 F: In the notched out opening of (172) Door Stop attach the Magnetic Catch using 2 (S38) #7 x 1-1/8” Pan Screws. (fig. 17.7) Important: Use a hand held screw driver and DO NOT over tighten. G: On the inside of the assembly, attach (172) Door Stop to (073) Narrow Front Panel with 3 (S11) #8 x 2”...
  • Page 48 Step 18: Front Wall Assembly Part 1 A: Center (181) Table Support so that it’s flush to the notches in (182) Table Top as shown in fig. 18.1. Attach using 4 (S7) #12 x 2” Pan Screws as shown in fig. 18.1. B: Place Table Top Assembly in the center of opening and tight to (082) Front Wall Panel and attach (181) Table Support to (082) Front Wall Panel with 2 (S3) #8 x 2-1/2”...
  • Page 49 Step 18: Front Wall Assembly Part 2 C: From the inside of the assembly attach (182) Table Top to slats in (082) Front Wall Panel with 2 Flat Brackets using 3 (S0) #8 x 7/8” Truss Screws per bracket. (fig. 18.4 and 18.5) Fig.
  • Page 50 Step 19: Install Bell Assembly Part 1 A: Place (191) Bell Top on top of (192) Bell Support so the angled and back edges are flush then attach with 3 (S20) #8 x 1-3/8” Wood Screws. Repeat by attaching (193) Bell Top Right to top of (192) Bell Support. Rounded ends of (191) Bell Top and (193) Bell Top RT are at the bottom.
  • Page 51 Step 19: Install Bell Assembly Part 2 C: Centred under the peak of the Bell Support Assembly attach Horseshoe Mount to (073) Narrow Front Panel with 4 (S0) #8 x 7/8” Truss Screws. (Fig. 19.3 & 19.4) D: Thread the Steel Clapper Line through the Bolt. Slide Bell under overhang of Horseshoe Mount then insert Bolt up through Bell and Horseshoe Mount then secure with Nut.
  • Page 52 (201) Engineered SW Beam as shown in fig. 20.1 and 20.4. IT IS IMPORTANT THAT THIS BOLT IS ATTACHED. IT WILL MINIMIZE CHECKING OF WOOD. D: Attach Cedar Summit / Kidkraft Plaque to centre of (201) Engineered SW Beam (over top of t-nut) using 4 (S38) #7 x 1-1/8” Pan Screws. (fig. 20.5) Fig.
  • Page 53 Step 20: Swing Beam Assembly Part 2 E: On the Fort End of (201) Engineered SW Beam attach 2 Heavy Flat Brackets with 2 (G21) 5/16 x 3-3/4” Hex Bolts (with 2 flat washers and 1 lock nut). (fig. 20.6 and 20.7) F: Place (202) SW Mount in between both Heavy Flat Brackets and place 1 Heavy L-Bracket against (201) Engineered SW Beam and (202) SW Mount.
  • Page 54 Step 21: Swing Post Assembly Part 1 Heavy L-Bracket Note: Keep all bolts from Step 21 series loose Fig. 21.1 until start of Step 23 Bottom View A: Place (211) SW Block Angle on top of (212) Block SW and attach 2 Heavy L-Brackets on top of (211) SW Block Angle feeding 2 (G17) 3/8 x 6”...
  • Page 55 Step 21: Swing Post Assembly Part 2 D: Place Swing End of (201) Engineered SW Beam in between Heavy L-Brackets assembled in Step A making sure holes are lined up then attach Swing Post Assembly to Swing Beam Assembly using 1 (G20) 3/8 x 4” Hex Bolt (with 2 flat washers and lock nut) through Heavy L-Bracket.
  • Page 56 Step 21: Swing Post Assembly Part 3 F: Place (202) SW Mount flush to the top of (081) SW Wall Panel. Attach with 1 (G5) 5/16 x 4-1/2” Hex Bolt (with lock washer, flat washer and t-nut) in the bottom hole from outside the assembly and 1 (G5) 5/16 x 4-1/2” Hex Bolt (with 2 x flat washer and 1 lock nut) in the top hole from inside the assembly.
  • Page 57 Step 22: Attach Cross Support Pre-drill all holes using a 3/16” drill bit before installing the lag screws. Fig. 22.1 A: To adjust for uneven ground, raise or lower the (221) Support Cross on the (213) SW Post. Make sure the Support Cross is level prior to attaching with the lag screws.
  • Page 58 Step 23: Final Swing Post Assembly Pre-drill all holes using a 3/16” drill bit before installing the lag screws. Note: Tighten all bolts from Step 21 series before installing lag screws. A: Attach 1 (LS9) 5/16 x 4-3/4” Lag Screw (with flat washer) into each (213) SW Post, as shown in fig. 23.1. B: Attach 1 (LS9) 5/16 x 4-3/4”...
  • Page 59 Step 24: Install Ground Stakes EN71 version MOVE FORT TO FINAL LOCATION PRIOR TO STAKING FINAL LOCATION MUST BE LEVEL GROUND A: In the 5 places shown in fig. 24.1 drive the Rebar Ground Stakes 13” into the ground against (142) Diagonal, (072) Narrow Back Panel, (021) Left Access and both (213) SW Posts.
  • Page 60 Step 25: Roof Support Assemblies A: Attach 1 (251) Roof Support to a second (251) Roof Support at peak using 1 (S4) #8 x 3” Wood Screw. Repeat this step to make 2 Roof Support Assemblies. (fig. 25.1) Fig. 25.1 Repeat this Step A Wood Parts Hardware...
  • Page 61 Step 26: Large Roof Assembly Part 1 A: Place (261) Front Roof Panel against (262) Back Roof Panel so the tops form a peak, then tight to the inside edge of the outside slats attach 1 Narrow Angle Bracket per slat with 2 (S0) #8 x 7/8” Truss Screws per bracket. (fig.
  • Page 62 Step 26: Large Roof Assembly Part 2 C: Place 1 Roof Support Assembly against one end of the roof panel assembly so the peaks meet and the ends of the roof supports are flush with the ends of the roof panels. Attach with 8 (S11) #8 x 2” Wood Screws. (fig. 26.3) D: Attach the second Roof Support Assembly on the opposite side, peaks to meet and ends are flush with 8 (S11) #8 x 2”...
  • Page 63 Step 27: Transom Assembly Part 1 A: With the notches facing down tap 3 1/4” T-nuts into (271) TB Support then fit (273) Left Upright, (272) Right Upright and (274) Centre Upright into the notches so the ends and tops are flush. Attach with 3 (H9) 1/4 x 1-1/4” Hex Bolts (with lock washer and flat washer).
  • Page 64 Step 27: Transom Assembly Part 2 B: Place 2 MOD 5 Pane Windows in the openings and attach to (272) Right Upright, (273) Left Upright and (274) Centre Upright with 4 (S0) #8 x 7/8” Truss Screws per window. (fig. 27.2) C: Attach (275) Wall Tie flush to the top of (271) TB Support and to (274) Centre Upright with 4 (S11) #8 x 2”...
  • Page 65 Step 28: Swing Top Assembly A: Attach (281) Swing Top to 2 (282) Swing Side Uprights with 2 (H3) 1/4 x 2-1/2” Hex Bolts (with lock washer, flat washer and t-nut). (fig. 28.1) Fig. 27.1 1/4” Lock Washer 1/4” Flat Washer 1/4”...
  • Page 66 Step 29: Attach Wall Supports Note hole orientation for this step. A: Tight to the floor boards and tight in each corner of the (081) SW Wall Panel attach 2 (291) Wall Supports to (081) SW Wall Panel with 3 (S3) #8 x 2-1/2” Wood Screws per support. (fig. 29.1) Fig.
  • Page 67 Step 30: Attach Swing Top Assembly A: Tight to the top of (081) SW Wall Panel and flush to the outside of each (291) Wall Support place Swing Top Assembly then attach (291) Wall Supports to (282) Swing Side Uprights with 2 (S3) #8 x 2-1/2” Wood Screws per support.
  • Page 68 Step 31: Attach Transom Assembly Part 1 A: Place 1 Transom Assembly on both (082) Front Wall Panel and (083) Back Wall Panel so they are tight to (281) Swing Top and (291) Wall Supports. From the outside attach each Transom Assembly to (291) Wall Supports with 2 (S3) #8 x 2-1/2”...
  • Page 69 Step 31: Attach Transom Assembly Part 2 D: Attach the top of each MOD 5 Pane Window to each (271) TB Support with 1 (S0) #8 x 7/8” Truss Screw per window then attach bottom of windows to (082) Front Wall Panel and (083) Back Wall Panel with 2 (S0) #8 x 7/8” Truss Screws per window.
  • Page 70 Step 32: Attach Swing Top Small A: Flush to the inside edge of each transom assembly attach 1 (321) Swing Top Small using 2 (S3) #8 x 2-1/2” Wood Screws per side. (Fig. 32.1 and 32.2) Transom Fig. 32.1 Assembly Transom Assembly Fig.
  • Page 71 Step 33: Attach Large Roof Assembly A: With 2 people on the ground and at least 1 person in the fort, lift the Large Roof Assembly up and over the Back side of the fort. Guide the Roof Assembly onto the fort so all four (251) Roof Supports sit flush to the front and outside edges of (281) Swing Top and the (321) Swing Top Small.
  • Page 72 Step 34: Attach Swings A: Using 1 Threaded Quick Link per rope, join 1 Swing Rope w/crimps to each side of the Swing Belt Seat. Make sure to close the Threaded Quick Link tightly using an adjustable wrench. (fig. 34.1 and 34.2) B: Using 1 Threaded Quick Link per rope, join the Acro Rope EN71 to the Acro Bar.
  • Page 73 Step 35: Assemble and Attach BBQ Kitchen Part 1 A: On (082) Front Wall place BBQ Base on (182) Table Top. Use BBQ Cooktop as a guide so there is enough room for BBQ Cooktop and 1” gap to the edge of the wall to the left of BBQ Base. Attach BBQ Base to (182) Table Top with 4 (S0) #8 x 7/8”...
  • Page 74 Step 35: Assemble and Attach BBQ Kitchen Part 2 C: Place Faucet and 2 Sink Knobs in opening of Sink and attach Sink Knobs with included hardware. (fig. 35.5) Important: Use a hand held screw driver and DO NOT over tighten. D: Slide BBQ Cooktop tight beside BBQ Base on the left and BBQ Sink Set tight on the right.
  • Page 75 Step 36: Attach Utensil Shelves Part 1 A: From outside the assembly in the top of the opening of (082) Front Wall Panel, 1” in from the panel, attach 1 Utensil Shelf with 2 (S0) #8 x 7/8” Truss Screws as shown in fig. 36.1 and 36.2. B: Attach Sign to the Utensil Shelf.
  • Page 76 Step 36: Attach Utensil Shelves Part 2 C: From outside the assembly, centred below the BBQ Kitchen attach 1 Utensil Shelf to (181) Table Support with 2 (S0) #8 x 7/8” Truss Screws as shown in fig. 36.4 and 36.5. D: Attach Pan, Tongs and Spatula to the Utensil Shelf.
  • Page 77 Step 37: Attach Slides to Fort Note: Pre-drill all holes using a 1/8” drill bit before installing the pan screws. A: Place Slide centred in the opening of the (082) Front Wall Panel. (fig. 37.1) B: Attach slide to fort using 4 (S7) #12 x 2” Pan Screws. (fig. 37.2) Fig.
  • Page 78 Step 38: Install Nest Wall Joists A: Measure 5/8” (15.9mm) down from the top of the End Wall and place 1 (381) Nest Floor Joist A so that the 2 pre- drilled holes are on the left side. Before attaching the Nest Joist make sure that it measures 1-7/8” (47.1mm) from the left edge of the assembly and 1-15/32”...
  • Page 79 Step 39: Attach Rock Wall Frame to Fort A: With a helper hold Rock Wall Frame in place so that the corner of the Rock Frame lines up with the End Wall corner. (fig. 39.4) Make sure that the bottoms of both walls are flush. Attach using 4 Front Wall Brackets with 3 (S6) #12 x 1” Pan Screw per bracket.
  • Page 80 Step 40: Attach TNR Brace A: With a helper, hold the Narrow Wall Frame in place as shown in fig.40.1. Place (401) TNR Brace Support so that it connects the Rock Wall Frame and the Narrow Wall Frame, making sure that the outside bolt holes are at the bottom.
  • Page 81 Step 41: Install Side Supports A: Place a (411) Side Support on the inside of the Narrow Wall Frame so that it sits behind the (401) TNR Brace Support at shown in fig. 41.1. Pre-drill holes using a 3/16” (4.8 mm) drill bit, then attach Side Support from the outside of the Narrow Frame using 3 (WL5) ¼...
  • Page 82 Step 42: Install TNR Floor Supports A: From inside the assembly attach (421) TNR Floor Support to each Side Support using 1 (H3) ¼ x 2-1/2” Hex Bolt (with lock washer, flat washer and t-nut) per side. (fig.42.1 and 42.3 ) B: From outside the assembly attach (422) TNR Front Support to (421) TNR Floor Support using 1 (H3) ¼...
  • Page 83 Step 43: Install Upper SL Insert A: From inside the assembly place the (431) Upper SL Insert so that the narrow board is at the bottom. Make sure that it’s flush with the (411) Side Supports and attach each end using a Flat Panel Bracket with 4 (S0) #8 x 7/8”...
  • Page 84 Step 44: Install Nest Floor Joists Part 1 A: Measure 5/8” (15.9mm) down from the top of the (431) SL Insert and place (441) Nest Floor Joist B on the inside as shown in fig.44.2. Install from the outside using 2 (H11) ¼ x 2-3/4” Hex Bolts (with lock washer, flat washer and t-nut) and from the inside using 3 (S11) #8 x 2”...
  • Page 85 Step 44: Install Nest Floor Joists Part 2 B: Measure 5/8” (15.9mm) down from the top of the (053) Rope Support Back and the (064) Narrow Wall Cross and place (442) Nest Floor Joist C so that it lines up with the pre-drilled holes. Install using 2 (S4) #8 x 3” Wood Screws per side.
  • Page 86 Step 45: Install Slide Block A: Center (451) Slide Block so that it’s under the (422) TNR Front Support and behind the (401) TNR Brace Support. Attach (451) Slide Block to the (422) TNR Front Support from the outside using 2 (S11) #8 x 2” Wood Screws. (fig.45.1 and 45.3) B: Check to ensure that Brace Assembly is square and then install 2 (S11) #8 x 2”...
  • Page 87 Step 46: Attach Narrow Wall to Fort A: Measure 4” (10cm) up from the ground and install 1 Wall Bracket using 3 (S6) #12 x 1” Pan Screws as shown in fig. 46.2 to connect the Narrow Wall to the Back Wall Panel. B: Evenly space and install 3 more Wall Brackets to secure Narrow Wall to Fort.
  • Page 88 Step 47: Install Upper and Lower Nest Floor Boards Part 1 A: On the left side of the Lower Nest install 1 (471) Nest Floor Board G using 5 (S20) #8 x 1-3/8” Wood Screws making sure that it’s tight to the (064) Narrow Wall Cross. (Fig. 47.1 & 47.3) B: On the right side, place 1 (472) Nest Floor Board A making sure that it’s tight to the (054) Rock Wall Floor Cross and attach using 5 (S20) #8 x 1-3/8”...
  • Page 89 Step 47: Install Upper and Lower Nest Floor Boards Part 2 C: From left to right, evenly space (477) Nest Floor Board F, (476) Nest Floor Board E, (475) Nest Floor Board D, (474) Nest Floor Board C and (473) Nest Floor Board B. Attach each board using 5 (S20) #8 x 1-3/8” Wood Screws. (Fig.
  • Page 90 Step 47: Install Upper and Lower Nest Floor Boards Part 3 D: Repeat steps A-C to install Upper Nest Floor Boards. (Fig. 47.6 & 47.7 & Fig. 47.8 & 47.9 & 47.10) Fig. 47.6 Fig. 47.8 Fig. 47.7 Fig. 47.10 Fig.
  • Page 91 Step 48: Attach Nest Ladder Part 1 A: Place Nest Ladder (built in Step 3) in the second level of the Clubhouse so that the top of the ladder is leaning flat against the (041) Nest Mid Joist. (Fig. 48.4) B: Place 1 (121) Floorboard so that it’s flush to (041) Nest Mid Joist.
  • Page 92 Step 48: Attach Nest Ladder Part 2 D: Measure to ensure that there is a minimum of 1-1/8” between (082) Front Wall Panel and (031) Nest Left Access. Center 1 Corner Bracket on the bottom inside edge of (032) Nest Right Access making sure that the straight edge of the bracket is on the floor board.
  • Page 93 attach floor board flush to nest mid joist, attach ladder to nest mid joist, flush to top of floor. predrill holes Step 49: Install Nest Long Floor Boards A: Place 3 (121) Floor Boards between the Nest Ladder and the (071) Nest End Panel and attach using 6 (S20) #8 x 1-3/8”...
  • Page 94 Step 50: Attach Roof Gable Support A: Place (501) Roof Gable Support across the underside of the (251) Roof Supports as shown in fig. 50.1. Check to ensure that the (501) Roof Gable Support is level and attach from underneath using 1 (S3) #8 x 2-1/2” Wood Screw per side.(Fig.
  • Page 95 Step 51: Install Nest Walls A: On each side of the Upper Nest place 1 (511) Wall Post so that the notch fits underneath the Swing Top Smalls. Making sure that they are flush with the edges, attach using 2 (S3) #8 x 2-1/2” Wood Screws per side. (Fig.
  • Page 96 Step 52: Install Short Wall Ties A: On the inside of each (511) Wall Post place 1 (521) Short Wall Tie so that its centered over the (511) Wall Post and the (272) Right Upright. Attach each board from the inside using 6 (S11) #8 x 2” Wood Screws and from the outside using 2 (S11) #8 x 2”...
  • Page 97 Step 53: Install Short Nest Rails A: On the left end of the (044) Nest Side Joist remove the (S3) Wood Screws which were installed in Step 4. These screws are no longer needed. B: Place 1 (531) Narrow Short Wall so that it’s flush with the left edge of the (044) Nest Side Joist and to the top of (501) Roof Gable Support.
  • Page 98 Step 54: Attach Nest Short Floor Boards A: Flush to the rails and the side of the joist install 1 (541) Short Floor Gap taking care to position it correctly. Attach using 4 (S20) #8 x 1-3/8” Wood Screws. B: In the remaining opening center 1 (542) Short Floor and attach using 4 (S20) #8 x 1-3/8” Wood Screws. Flush x 4 per board...
  • Page 99 Step 55: Attach Crow Ladder Grip A: Position Crow Ladder Grip with one end on the outside of the Nest Ladder and the opposite end on the outside of the (045) Ladder Side Joist. Pre-drill holes using a 1/8” drill bit then attach using 2 (WL3) 1/4 x 1-3/8” Wafer Lags (with flat washer).
  • Page 100 Step 56: Install Narrow Board A: In the middle opening on the Narrow Wall center 1 (561) Narrow Wall B making sure that it’s flush with the bottom. Attach in the locations shown using 6 (S20) #8 x 1-3/8” Wood Screws. (Fig. 56.1 & 56.2) Fig.
  • Page 101 Step 57: Assemble Rock Wall Part 1 It is important to note hole orientation for the following steps. A: In the upper left hand opening of the Rock Wall, center 1 (571) Rock Wall B making sure that it’s flush to the bottom.
  • Page 102 Step 57: Assemble Rock Wall Part 2 Note: Climbing Crater Rocks do not get installed until next step. D: Referring to (fig.57.3) for correct placement, attach Pinch Rock and the Pocket Rocks using 2 (PB2) ¼ x 1-1/4” Pan Bolts (with lock washer, flat washer and barrel nut) per rock. E: Attach each Rock B using 1 (PB2) ¼...
  • Page 103 Step 57: Assemble Rock Wall Part 3 It is important to note hole orientation for the following steps. F: Loosely attach each Climbing Crater Rock with 1 (PB2) ¼ x 1-1/4” Pan Bolt (with lock washer, flat washer and barrel nut) per rock. Maneuver each rock so that the second hole lines up with the pre-drilled hole in the board. Insert Pan Bolt into the second hole as a pin holding Climbing Crater Rock in place and mark the location for the 3rd hole.
  • Page 104 Step 57: Assemble Rock Wall Part 4 I: On (058) Rock Wall C, measure 6” up from the floorboards and center 1 Steel Hand Grip. Mark the hole locations and pre-drill with a 1/8” drill bit making sure holes are centered. Attach Steel Hand Grip using 2 (WL3) 1/4 x 1-3/8”...
  • Page 105 Step 58: Install Top Barriers Part 1 It is important to note hole orientations when installing Top Barriers. A: Place (581) Barrier Top C across the top front of (057) Narrow Wall A and (063) Rock Wall A making sure that it’s flush at the top and that the pre-drilled holes in the board are towards the bottom.
  • Page 106 Step 58: Install Top Barriers Part 2 B: Flush to the top of the Narrow Wall Frame attach (582) Barrier Top D from the outside using 4 (H10) ¼ x 2-1/4” Hex Bolts (with flat washer and t-nut). (Fig. 58.2) C: Flush to the top of the Rock Wall Frame attach (583) Barrier Top B from the outside using 4 (H10) ¼...
  • Page 107 Step 58: Install Top Barriers Part 3 D: Place (584) Barrier Top E across the top of the opening from (582) Barrier Top D to the (511) Wall Post. Attach to the (511) Wall Post using 2 (H10) ¼ x 2-1/4” Hex Bolts (with flat washer and t-nut) and to (582) Barrier Top D using 2 (S11) #8 x 2”...
  • Page 108 Step 59: Install Bottom Barriers Part 1 A: Flush with the top of the (431) Upper SL Insert install 1 (591) Barrier Bottom C to the Rock Wall and Narrow Wall Frames using 2 (S11) #8 x 2” Wood Screws per side. Fig.
  • Page 109 Step 59: Install Bottom Barriers Part 2 Note: It is important that all bottom barriers are installed flush to the lower frames leaving no gaps. B: Across the lower opening in the Narrow Wall install (592) Barrier Bottom D using 2 (S11) #8 x 2” Wood Screws per side.
  • Page 110 Step 59: Install Bottom Barriers Part 3 Note: It is important that all bottom barriers are installed flush to the lower frames leaving no gaps. D: Tight to (592) Barrier Bottom D, place (594) Barrier Bottom E across the opening on the Narrow Wall Panel side. Attach to the (511) Wall Post using 2 (S11) #8 x 2”...
  • Page 111 Step 60: Install Narrow Rail A: Center 1 (601) Narrow Wall Rail between (057) Narrow Wall A and (051) Rock Wall H. Attach the top of the Rail from the outside using 1 (H2) 1/4 x 2” Hex Bolt (with lock washer, flat washer and t-nut) and the bottom of the rail from the inside using 1 (S15) #8 x 1-3/4”...
  • Page 112 Step 61: Attach Nest Walls A: From the inside, place 15 (611) Nest Wall Rails around the 4 openings in the Upper Nest Walls as shown in fig. 61.2, taking care to ensure that the boards are evenly spaced. Attach each rail from the outside at the top using 1 (H1) 1/4 x 1-1/2”...
  • Page 113 Step 62: Install Roof Ties A: On each side of the Upper Nest place 2 (621) Roof Ties from the Top Barriers to the Roof Panel. It is important to make sure that they are flush to the tops and edges of the Top Barriers. Install each Roof Tie using 3 (S3) #8 x 2-1/2” Wood Screws per side.
  • Page 114 Step 63: Install Map Doodle Board A: In the Upper Nest, place Map Doodle Board in the location shown in fig.63.1 and attach using 4 (S0) #8 x 7/8” Truss Screws. (fig. 63.1) Map Doodle Fig. 63.1 Board Hardware Other Parts #8 x 7/8”...
  • Page 115 Step 64: Attach Telescope A: In the Upper Nest, center the Telescope Base on (584) Barrier Top E and attach with 2 (S20) #8 x 1-3/8” Wood Screws. Slide Telescope into position. (Fig. 64.1) Fig. 64.1 Telescope Hardware Other Parts #8 x 1-3/8”...
  • Page 116 Step 65: Attach Flag and Pole A: From the outside of the Upper Nest attach Flag and Pole to the right side of (581) Barrier Top C using 3 (S10) #8 x 1” Pan Screws.(Fig. 65.1) Fig. 65.1 Flag Pole Hardware Other Parts 1 x Flag...
  • Page 117 Step 66: Install SL Panel Part 1 A: In the bottom opening of the End Wall attach (661) SL Panel to the Rock Wall Frame and the Narrow Wall Frame using 4 (S3) #8 x 2-1/2” Wood Screws, making sure that the SL Panel is flush with the bottom of both frames. (Fig. 66.1) Fig.
  • Page 118 Step 66: Install SL Panel Part 2 B: From the outside, place (662) End Wall Top so that it fits over the SL Panel and is tight to each corner. Attach using 2 (S3) #8 x 2-1/2” Wood Screws. (Fig. 66.2) C: From the inside, place a Corner Bracket at the top of each slat so they are flush to the (662) End Wall Top.
  • Page 119 Step 67: Install Climbing Rope A: Feed one end of the Rope through the hole in (572) Rope Support and tie a knot in that end of the rope. (Fig. 67.1 & 67.3) B: Tie a second knot in the rope on the opposite side of (572) Rope Support so that the knots are tight to the board on both sides.
  • Page 120 Step 68: Install Steering Wheel A: On (081) SW Wall Panel attach Steering Wheel with 1 (WB10) 5/16 x 2-5/8” Wafer Bolt (with flat washer x 2 and t-nut). (Fig. 68.1 and 68.2) Fig. 68.1 Fig. 68.2 Inside View WB10 5/16”...
  • Page 121 Step 69: Slide Section Assemblies Part 1 Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round recess and the lock nuts go through the side with the hexagonal recess. (Fig. 69.3). A: Fit 2 TNR2 Slide Elbows together and attach with 8 (PB1) 1/4 x 3/4”...
  • Page 122 Step 69: Slide Section Assemblies Part 2 Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round recess and the lock nuts go through the side with the hexagonal recess. (Fig. 69.3) D: Attach TNR2 Slide Exit Top and the remaining TNR2 Slide Elbow together using 8 (PB1) 1/4 x 3/4”...
  • Page 123 Step 70: Attach Flange Assembly to Fort Part 1 A: With a helper place the Flange Assembly flush to the top opening in the Slide Wall as shown in fig.70.1, then pre-drill 1/8” pilot holes in (431) Upper SL Insert for the 4 upper mounting locations (approximate spots where circles are on figure), making sure the pre-drilled holes are a minimum of 1”...
  • Page 124 Step 70: Attach Flange Assembly to Fort Part 2 D: Place (701) SL Gusset centred and tight to (401) TNR Brace Support and attach to Flange Assembly with 2 (S6) #12 x 1” Pan Screws. (fig. 70.5 & 70.6) E: Pre-drill pilot hole with a 3/16” drill bit then attach (701) SL Gusset to (401) TNR Brace Support with 1 (WL5) 1/4 x 2-1/2”...
  • Page 125 Step 71: Attach Elbow Assembly to Flange Assembly Note: Keep all bolts loose until further step. A: Fit one of the Elbow Assemblies to the Flange Assembly by lining up the arrows on each assembly. Attach Elbow Assembly to Flange Assembly using 6 ¼ x 12.7mm” Pan Bolts and Square Lock Nut. (Fig. 71.2 & 71.3). B: Attach one of the Elbow assemblies to another Elbow Assembly making sure to line up the arrows on each assembly.
  • Page 126 Step 72: Attach TNR 3 Slide Exit to Elbow Assembly A: Insert flange of Exit Elbow Assembly (slide elbow) into the slots on TNR3 Short Exit. (fig. 72.1) B: Rotate Slide Exit and use Quadrex Driver as a guide pin so the holes are aligned and attach with 5 (PB1) 1/4 x 3/4”...
  • Page 127 Step 73: Attach Exit End Assembly to Fort A: Fit the Exit End Assembly to the last Elbow Assembly by lining up the arrows on each assembly. Notice the elbow orientation. (fig. 73.1 & 73.2). Attach with 6 (PB7) ¼ x 12.7mm Pan Bolts and Square Lock Nuts. Fig.
  • Page 128 Step 74: Attach TNR 4 Clamp Rings A: Place 2 TNR4 Clamp Rings around each joint on the top 4 slide sections making sure to match the arrows with the end of the Clamp Ring as shown in fig. 74.1 and 74.2. On the final section, rotate the clamp ring as shown. (fig. 74.1 and 74.2) B: Connect TNR4 Clamp Rings in 2 spots using 1 (PB6) ¼...
  • Page 129 Step 75: Attach TNR4 Slide to Fort A: On the fourth attached Elbow Assembly remove the pan bolt and nut which is facing the fort (installed in Step 70). (fig. 75.1) The bolt will no longer be needed, but keep the lock nut. B: Loosely attach TNR Long Tube Support (at the slightly bent end) to the slide seam using 1 (PB6) 1/4 x 1”...
  • Page 130 Step 76: TNR Brace Assembly A: Attach (761) TNR Upright to (762) TNR Ground Brace with 1 (G4) 5/16 x 4” Hex Bolt (with lock washer, flat washer and t-nut) in the top hole. Make sure both boards are square then attach with 1 (S3) #8 x 2-1/2” Wood Screw.
  • Page 131 Step 77: Attach Elbow Assemblies and TNR4 Slide A: Place 1 TNR4 Post Mount Clamp on either side of the Clamp Ring so that the bent tops clip in behind the Clamp Ring. (fig. 77.2) B: Insert the TNR4 Post Mount Base in between the 2 Post Mount Clamps and screw all pieces together using 1 ¼...
  • Page 132 Step 78: Attach Ground Stake to TNR Upright A: In the spot shown in fig. 78.1 drive 1 Rebar Ground Stake 13” into the ground against the (762) TNR Ground Brace. Be careful not to hit the washer while hammering stake into the ground as this could cause the washer to break off.
  • Page 133 Final Step: Attach I.D. Plaque ATTACH THIS WARNING & I.D. PLAQUE TO THIS LOCATION ON YOUR PLAY EQUIPMENT! This provides warnings concerning safety and important contact information. A Tracking Number is provided to allow you to get critical information or order replacement parts for this specific model. A: Attach KK Playset Plaque to a location on your set that is easily...
  • Page 134 NOTES europecustomerservice@kidkraft.com...
  • Page 135 Comments: MAIL TO: Fill out your registration card online at KidKraft Netherlands BV www.cedarsummitplay.com/ Olympisch Stadion 29 registration 1076DE Amsterdam The Netherlands Cedar Summit by KidKraft would like to say Attention: Customer Service Thank You for your time and feedback.

This manual is also suitable for:

Cedar summit lookout extreme