Step 66: Attach Large Roof Assembly
A: With 2 people on the ground and at least 1 person in the fort, lift the Large Roof Assembly up and over the
Back side of the fort. Guide the Roof Assembly onto the fort so all four (501) Roof Supports sit flush to the front
and outside edges of (571) Swing Top and each (641) Long Roof End. The Gable Dormer Assembly is at the
Front. (fig. 66.1 and 66.2)
B: Attach (501) Roof Supports to (571) Swing Top and each (641) Long Roof End with 1 (S3) #8 x 2-1/2" Wood
Screw per support. (fig. 66.1 and 66.2)
501
501
Fig. 66.1
501
S3
S3
571
S3
Front Wall
641
641
501
Fig. 66.2
S3
641
Flush
Hardware
4 x
#8 x 2-1/2" Wood Screw
S3
119