Download Print this page

KidKraft Cedar Summit Adventure Ridge Playset Installation And Operating Instructions Manual page 52

Hide thumbs Also See for Cedar Summit Adventure Ridge Playset:

Advertisement

Step 17: Final Swing Post Assembly
Pre-drill all holes using a 3/16" drill bit before installing the lag screws.
Note: Tighten all bolts from Step 15 series before installing lag screws.
A: Attach 1 (LS9) 5/16 x 4-3/4" Lag Screw (with flat washer) into each (153) SW Post, as shown in fig. 17.1.
B: Attach 1 (LS9) 5/16 x 4-3/4" Lag Screw (with flat washer) into remaining hole of the Heavy C-Bracket into
(140) Engineered SW Beam. (fig. 17.1)
Fig. 17.1
LS9
5/16" Flat
Washer
5/16" Flat
140
Washer
Heavy C-Bracket
153
Hardware
3 x
5/16 x 4-3/4" Lag Screw
LS9
(5/16" flat washer)
52
LS9

Hide quick links:

Advertisement

loading