Suzuki WagonR+ RB310 Service Manual page 1013

Table of Contents

Advertisement

7B1-48 AUTOMATIC TRANSAXLE (M13 ENGINE MODEL)
Diagnostic Flow Table A-5: TCM Power and Ground Circuit Check
Wiring Diagram
1. TCM
2. A/T relay
Troubleshooting
Step
1
Check TCM Back-up Power Circuit
1) Disconnect TCM connector with ignition
switch OFF.
2) Check for proper connection to TCM at
"E13-24" terminal.
3) If OK, check voltage at terminal "E13-24" of
disconnected TCM connector.
Is it 10 – 14 V?
2
Check TCM Power Circuit.
1) Disconnect TCM connector with ignition
switch OFF.
2) Check for proper connection to TCM at
"E13-6" terminal.
3) If OK, turn ignition switch ON and check
voltage at terminal "E13-6" of disconnected
TCM connector.
Is it 10 – 14 V?
3
Check A/T Relay Operation.
Check A/T relay operation referring to "A/T
Relay Inspection" in this section.
Is check result satisfactory?
1
E13-24
E13-6
E13-1
E13-23
[A]
E13
6
24 23
3. Ignition switch
[A]: Terminal arrangement of TCM connector (viewed from harness side)
Action
WHT/BLU
3
2
+BB
WHT/RED
GRN
BLK
BLK/WHT
BLK
BLK
E12
1
Yes
Go to Step 2.
Go to Step 4.
"WHT/RED", "GRN".
"BLK/WHT" or "BLK" cir-
cuit for power supply
open.
No
"WHT/BLU" circuit open
or shorted to ground.
Go to Step 3.
Replace A/T relay.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Wagonr+ rb4130Wagonr+ rb413

Table of Contents