Oil Pump Removal And Installation; Oil Pump Disassembly And Assembly - Suzuki WagonR+ RB310 Service Manual

Table of Contents

Advertisement

6A2-40 ENGINE MECHANICAL (M13 ENGINE)
[A]: Sealant application amount
"a": 3 mm (0.12 in.)
"b": 2 mm (0.08 in.)
1. Rotor plate
2. O ring
3. Outer rotor
4. Inner rotor
5. Timing chain cover
: Apply sealant 99000-31140 to the
mating surface of cylinder and cylinder
head.
: Apply sealant 99000-31250 to mating
surface of timing chain cover referring
to the figure of Step 4) of "Installation"
under "Timing Chain Cover Removal
and Installation" in this section.
6. Oil pump rotor plate bolt
7. Relief valve
8. Spring
9. Retainer

Oil Pump Removal and Installation

Removal
Remove timing chain cover referring to "Timing Chain Cover
Removal and Installation" in this section.
Installation
For installation referring to "Timing Chain Cover Removal and
Installation" in this section.

Oil Pump Disassembly and Assembly

Disassembly
1) Remove rotor plate (1) by removing its mounting bolts.
2) Remove outer rotor (1) and inner rotor (2).
10. Circlip
Tightening torque
Do not reuse.
Apply thin coat of engine oil to sliding
surface of each parts.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Wagonr+ rb4130Wagonr+ rb413

Table of Contents