Establishing The Fluid Connections - Teledyne ACCQPrep HP125 Installation And Operation Manual

Table of Contents

Advertisement

ACCQPrep HP125
Section 2 Installation
Figure 2-24 Power cable on the ACCQPrep
2.4.1 Establishing the Fluid
Connections
Figure 2-25 Probe fitting connected to inlet port #2
2-16
Note
The power supply accompanying the AutoSampler will not be
used, the AutoSampler will receive its power supply through
the ACCQPrep.
15. Power for the AutoSampler is provided by the ACCQPrep.
On the rear panel of the ACCQPrep, the power cord is
coiled and retained (Figure 2-24). Remove the retainer and
route the power cable to the mating connector on the
AutoSampler Module.
To establish the necessary fluid connections:
1. Connect the sample probe fitting to the inlet port #2 of the
injection valve on the ACCQPrep (Figure 2-25).
Inlet Port #2
2. Secure the probe tubing to the side of the ACCQPrep by
removing the housing screw, fitting the tubing bracket to
the screw, and replacing the screw (Figure 2-25).
3. The tubing bracket should be affixed to the ACCQPrep so
that the probe tubing threads vertically through the
bracket. This ensures that the probe tubing will not be
obstructed by the other end of the probe attachment (Fig-
ure 2-26).

Advertisement

Table of Contents
loading

Table of Contents