Teledyne ACCQPrep HP125 Installation And Operation Manual page 34

Table of Contents

Advertisement

ACCQPrep HP125
Section 2 Installation
Figure 2-29 Power switch for the ACCQPrep
Prime AutoSampler Wash
Station
Figure 2-30 Screen of Start Wash button
2-18
2. Turn O
the power to the ACCQPrep. A red light on the
N
AutoSampler will light up, the arm will move to the H
position, and then the light will turn blue (Figure 2-29).
1. Ensure the wash station supply line is placed into a suit-
able solvent (typically the strong chromatographic solvent)
and the waste line is routed to a suitable container.
2. Go to T
|A
OOLS
UTOMATION
the S
W
button (Figure 2-30).
TART
ASH
3. Ensure the wash solvent is pumped into the center portion
of the wash station and when full, the fluid drains into the
overflow drain (Figure 2-31).
M
C
, and select
ANUAL
ONTROL
OME

Advertisement

Table of Contents
loading

Table of Contents